BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Brighton, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000346786 Job Location: Brighton, MI Road Name: Various Length: Various The City of Brighton, Michigan desires to employ the services of a contractor, or contractors, to perform bituminous chip sealing and fog sealing of Appian Way and City owned facility driveways. Question Deadline 04/05/2024 at 4:00 PM ET Questions are submitted online Yes, Deadline for bidder inquiries All questions must be submitted via email (gochm@brightoncity.org) Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % As part of your bid response, it will be required to provide bid security. The bid security must be a certified check or bid bond made out to the City of Brighton for Five Percent (5%) of the Total Bid, in a form approved by the City Attorney. City reserves the right to accept or reject any or all bids, in part or whole and to waive informalities and minor irregularities in bids received. The City of Brighton, Michigan desires to employ the services of a contractor, or contractors, to perform bituminous chip sealing and fog sealing of Appian Way and City owned facility driveways. Appian Way (from Grand River to End - 6,911 square yards Driveways Wastewater Treatment Plant - 6570 Hamburg Road, Brighton 7,275 square yards Water Treatment Plant - 7377 Challis Road, Brighton 3,325 square yards DPW - 420 S. Third Street, Brighton 1,470 square yards Totals are estimates. It is the responsibility of each contractor to obtain actual measurements for bidding purposes. Pricing will include all materials, labor and equipment necessary for the full completion of this project. Changes outside of the contract must be approved by the DPS Director. b. Project time to be coordinated with Brighton DPS so sufficient notice can be given to businesses and the public. c. Access to areas being chip sealed must remain open to vehicle traffic as much as possible. d. Any damage and repairs to property sustained during the project is the responsibility of the contractor. e. All traffic safety is the responsibility of the contractor and shall follow the MMUTCD manual. f. Proper cleanup of all areas of service is the responsibility of the contractor.

Award

Roads / Highways

$222,223.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
107
Bidding Soon
1,487
All Active Projects
631
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2024

May 10, 2024

img_map_placeholder

Multiple Locations, Brighton, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.