BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 25, 2024 at 8:00 PM

Updated October 26, 2024

Site work and new construction of a municipal facility in Fallon, Nevada. Completed plans call for the construction of a 29,646-square-foot, one-story above grade, 22-unit municipal facility; and for site work for a municipal facility.

All questions must be submitted in writing to elsa@travois.com. Questions via phone will be required to be submitted in writing for an answer. The question period will end on Monday, October 14th (5pm PST) with response sent to group by Thursday, October 17th. EOD. No additional questions will be allowed after this time This new construction project will include 22 units, and a community building with playground area. The development is located in Fallon, Nevada. There are 7 multifamily buildings which in total will include 4 one-bedroom units, 9 two-bedroom units, 6 three-bedroom units, and 3 fourbedroom units. The project will have two accessible units type A, and one sensory or communications unit. The development will also include community amenities such as the community building, benches, picnic tables, playground equipment and area, covered parking lots, trash enclosures, and landscaping pe deferred submittal, and associated site infrastructure. The infrastructure design is under the horizontal package. The Fallon Paiute Shoshone Tribe Is Inviting Firms To Submit Sealed Bids For Generally Contracted Construction Services Relating To The Fpst Lihtc I Homes Project. The Project Is Located In Fallon, Nevada, And Consists Of The New Construction Of 22 Units On 7 Multifamily Buildings, A Community Building And Infrastructure Development. The Unit Mix Consists Of 1,2,3 And 4-bedroom Homes And Community Spaces That Total 29,646 Square Feet. PROJECT BUDGET The project budget is as follows: Civil Infrastructure: $2 Million Vertical Construction: $8.8 Million APN: 007-511-11 Project Description: This new construction project will include 22 units, and a community building with playground area. The development is located in Fallon, Nevada. There are 7 multifamily buildings which in total will include 4 one-bedroom units, 9 two-bedroom units, 6 three-bedroom units, and 3 fourbedroom units. The project will have two accessible units type A, and one sensory or communications unit. The development will also include community amenities such as the community building, benches, picnic tables, playground equipment and area, covered parking lots, trash enclosures, and landscaping perdeferred submittal, and associated site infrastructure. The infrastructure design is under the horizontal package. 100% Completion June 1, 2026

Post-Bid

Municipal

$10,000,000.00

Public - Federal

New Construction, Site Work

99

27

38

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
15
Bidding Soon
246
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

December 23, 2024

Project location map

565 Rio Vista Dr, Fallon, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.