Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Hampton, Virginia. Completed plans call for the renovation of a swimming pool.
Amendment 04 - Question and Answers posted with photos from site visit This requirement is to provide non-personal services to furnish all labor, tools, equipment, transportation, materials, and supervision necessary to perform repairs to the aluminum liner of the pool at Langley. This includes precision cutting and welding activities to ensure the integrity and functionality of the pool's aluminum liner. Any questions must be submitted by 1300, March 25, 2024, Monday. Scope of Work: The contractor shall provide non-personal services to furnish all labor, tools, equipment, transportation, materials, and supervision necessary to perform repairs to the aluminum liner of the pool at Langley. This includes precision cutting and welding activities to ensure the integrity and functionality of the pool's aluminum liner. Cutting Holes in Aluminum Pool Liner: o The contractor is to cut twelve (12) holes, each measuring 24 inches by 24 inches, in the specified locations on the aluminum pool liner. These locations will be clearly marked and provided by the overseeing authority at Langley. Welding Patches for Holes: o Following the cutting phase and an intervening period as directed by the government, the contractor shall weld aluminum patches into each of the twelve (12) holes to restore the pool liner's integrity. This welding must ensure a water-tight seal capable of withstanding the operational pressures of the pool. Inspection: o Upon completion of the work, the contractor shall inform the Langley representative to schedule an inspection. All work will be inspected by Langley's designated authority prior to acceptance. The contractor must ensure that the repair work meets all specified requirements and standards for safety and quality. Timeline: o Lead Time: The contractor must be ready to begin work within 1-2 weeks of contract award. o Completion: The project, including both cutting and subsequent welding phases, is expected to be completed within the agreed lead time, allowing for the pool's timely return to service. The specific timing for welding and patching will be determined based on government direction. Contractor Requirements: o The contractor is responsible for providing all necessary materials, equipment, and labor to complete the project as described. o All work must comply with relevant safety standards and regulations. o The contractor will perform a final walkthrough with the Langley representative to ensure the quality and durability of the repairs
Post-Bid
Swimming Pools
$100,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 29, 2024
April 29, 2024
To Be Determined, Hampton, VA
Related To This Project
Hampton, VA
--
Hampton, VA
Bid Date: Apr 18 2024
Hampton, VA
Bid Date: Apr 18 2024
Hampton, VA
Bid Date: May 01 2024
Hampton, VA
--
Hampton, VA
Bid Date: Apr 24 2024
Hampton, VA
Bid Date: Jun 11 2024
Hampton, VA
Bid Date: May 09 2024
Hampton, VA
Bid Date: Apr 11 2024
Hampton, VA
Bid Date: Apr 30 2024
Hampton, VA
--
Hampton, VA
--
Hampton, VA
--
Hampton, VA
Bid Date: Apr 17 2024
Hampton, VA
Bid Date: Apr 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.