BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Hampton, Virginia. Completed plans call for the renovation of a swimming pool.

Amendment 04 - Question and Answers posted with photos from site visit This requirement is to provide non-personal services to furnish all labor, tools, equipment, transportation, materials, and supervision necessary to perform repairs to the aluminum liner of the pool at Langley. This includes precision cutting and welding activities to ensure the integrity and functionality of the pool's aluminum liner. Any questions must be submitted by 1300, March 25, 2024, Monday. Scope of Work: The contractor shall provide non-personal services to furnish all labor, tools, equipment, transportation, materials, and supervision necessary to perform repairs to the aluminum liner of the pool at Langley. This includes precision cutting and welding activities to ensure the integrity and functionality of the pool's aluminum liner. Cutting Holes in Aluminum Pool Liner: o The contractor is to cut twelve (12) holes, each measuring 24 inches by 24 inches, in the specified locations on the aluminum pool liner. These locations will be clearly marked and provided by the overseeing authority at Langley. Welding Patches for Holes: o Following the cutting phase and an intervening period as directed by the government, the contractor shall weld aluminum patches into each of the twelve (12) holes to restore the pool liner's integrity. This welding must ensure a water-tight seal capable of withstanding the operational pressures of the pool. Inspection: o Upon completion of the work, the contractor shall inform the Langley representative to schedule an inspection. All work will be inspected by Langley's designated authority prior to acceptance. The contractor must ensure that the repair work meets all specified requirements and standards for safety and quality. Timeline: o Lead Time: The contractor must be ready to begin work within 1-2 weeks of contract award. o Completion: The project, including both cutting and subsequent welding phases, is expected to be completed within the agreed lead time, allowing for the pool's timely return to service. The specific timing for welding and patching will be determined based on government direction. Contractor Requirements: o The contractor is responsible for providing all necessary materials, equipment, and labor to complete the project as described. o All work must comply with relevant safety standards and regulations. o The contractor will perform a final walkthrough with the Langley representative to ensure the quality and durability of the repairs

Post-Bid

Swimming Pools

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
74
Bidding Soon
1,323
All Active Projects
599
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 29, 2024

April 29, 2024

img_map_placeholder

To Be Determined, Hampton, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.