BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Minneapolis, Minnesota. Working plans call for the renovation of a medical facility.

Page 3 of 3 This is a Pre-Solicitation Notice regarding project: 618-23-102, Correct Electrical Deficiencies at the Minneapolis VA Health Care System (VAHCS), Minnesota. The Department of Veterans Affairs, Network Contracting Office 23 (NCO 23), is preparing to issue a solicitation for a Two-Phase Design-Build contract for this project. Note: This is a Pre-Solicitation Notice only, the Solicitation will not be posted for at least 15 days from the date of this notice. This is NOT a request for proposal. Estimated SOLICITATION DATE (Phase I): on or about 04/8/2024 Estimated AWARD DATE: 09/15/2024 SET-ASIDE: 100% Service-Disabled Veteran Owned Small Business (SDVOSB) NAICS: 238210, Electrical Contractors and Other Wiring Installation Contractors SMALL BUSINESS SIZE STANDARD: $19 million PROJECT MAGNITUDE: $2,000,000 to $5,000,000 Project Overview The project will require the selected contractor to provide all design, labor, materials, tools and equipment, and construction services necessary for the design and construction of the project:618-23-102 is to correct electrical deficiencies as defined by the Scope of Work (SOW). The Two-Phase Design-Build solicitation and evaluation process shall be conducted in accordance with Federal Acquisition Regulation (FAR) Subpart 36.3 (Two-Phase Design-Build Selection Procedures). The issued RFP shall set forth the requirements for responding to Phase I of the solicitation, as well as all technical evaluation factors and sub-factors for both Phase I and Phase II. At the closing date of the Phase I Solicitation, the government shall evaluate responsive proposals received in response to Phase I of the solicitation. No more than four (4) contractors will move forward to Phase II. Only those successful firms selected as a result of Phase I evaluations will be requested to submit technical and pricing proposals for Phase II. Phase II proposals shall be evaluated in accordance with the Phase II Evaluation Process. Project Description Background The Minneapolis VA Medical Center is undertaking initiatives to improve utility Infrastructure systems for healthcare services. The Medical facility currently has two major infrastructure projects in-progress, Correct Electrical Deficiencies FY18 and EHRM Infrastructure upgrades. The power demands for new equipment and healthcare services are placing a heavy demand on the electrical system. Aging electrical equipment is susceptible to failure if the electrical utility infrastructure is not updated to keep up with the power demands from new equipment and healthcare services. This Project, Correct Electrical Deficiencies FY23, will deliver utility infrastructure upgrades to the facilities main electrical utility switchgear which is aging. The main electrical utility switchgear provides power to the entire medical facility. This switchgear has been in operation since the medical facility first opened in 1988. The main electrical utility switchgear is housed at the boiler plant (Bldg. 69), located on the Medical Center Campus. The objective of this project is to modernize the main electrical utility switchgear which has aged and needs new replacement parts that are not procurable anymore and difficult to procure. In the past few years, failures have occurred to the main electrical utility switchgear. Outdated technology has proven to be an issue with isolating the FboNotice cause of the failure. Installation of new equipment with modern technology is introducing harmonic distortion into the electrical system. Harmonic distortion is causing bad power quality to be transmitted in the electrical system. Modernizing the main electrical utility switchgear will replace the existing components with new modern technology capable of advanced metering and monitoring capabilities. Modernizing the main electrical utility switchgear would also help improve the quality of electrical power received from the local utility company before the power is transmitted to the Medical Center. The requirement will be fulfilled by awarding a Firm-Fixed-Price contract for construction to Correct Electrical Deficiencies FY18 and EHRM Infrastructure upgrades at the Minneapolis (VAHCS). Intent Task 1 Modernize 13.8Kv electrical utility switchgear service including: a. Replace ten (10) 1200amp Porcel-line Type DHP Magnetic Air circuit breakers. Provide an emergency spare 1200amp breaker. The emergency spare is to remain in the electrical room and available for emergencies. b. Replace upper feeder relay compartment doors (11) with new doors and monitoring devices. Monitoring devices includes but is not limited to; fault protection devices, voltage relays, overcurrent relays, meters, switches, indicating lights and wire harnesses for each feeder section. The color of the new doors is to match the existing color of the switch gear. c. Replace all feeder section CTx s and PTx s in the 13.8kv utility switchgear. d. Conduct preventive maintenance to the 13.8kv utility feeder BUS assembly e. Remove and demo all old components. Task 2 Replace outdated substation, high voltage transformer, and feeder switchboard in Bldg. 69. a. Remove and demo existing substation with new substation, high voltage transformer, and feeder switchboard. b. Replace with new substation, high voltage transformer, and feeder switchboard. c. Update incoming feed conductors to substation if necessary. Task 3 Replace existing LeMarche battery charger and battery pack in Bldg. 69. a. Remove and demo the existing single battery charger and battery system. b. Replace with dual (2) battery chargers and 2 battery packs. c. Arrange the new battery chargers to function as primary and secondary backup sources. Task 4 Utility Switchgear monitoring a. Integrate VAMC 13.8kva electrical utility service to Engineering s Building Automation System, JCI or provide an alternate means of monitoring the utility switchgear activity in Building 70 of the main hospital. Task 5 ATS sequencing a. Correct ATS sequencing to transfer generator loads as prescribed by VA Electrical Design guide in the following order: 1. life safety, 2. critical, 3. Equipment b. Balance loads to Emergency Generator set to improve the efficiency and synchronization of the Generator set. Task 6 Replace degraded light bollards at the main entrance of the Medical Center. a. Remove and demolish existing light bollards. b. Replace with (VCBA) Voltaire Concrete Bollard Archi-linear LED type bollard. Anticipated Period of Performance: The anticipated completion of this project is 542 calendar days after Notice to Proceed (NTP)to Design. The required completion of this project is 343 calendar days from the Notice to Proceed (NTP) with Construction. The time stated for completion includes final cleanup of the premises, as-builts and closeout documents The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Medical

$5,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
71
Bidding Soon
1,704
All Active Projects
592
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 5, 2024

April 1, 2026

img_map_placeholder

1 Veterans Dr, Minneapolis, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.