BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a playground / park / athletic field in San Francisco, California. Completed plans call for the renovation of a playground / park / athletic field.

RFQP-Kezar Pavilion Renovation - City and County of San Francisco San Francisco Public Works (“Public Works”) and San Francisco Recreation & Parks (“SFRPD”), which may collectively be referred to as the (“City”), announce a Request for Qualifications and Proposals (“RFQP”), inviting interested parties to submit their qualifications and a competitive proposal to provide preconstruction, construction management, general contracting and value engineering services from trade subcontractors for the SFRPD Kezar Pavilion Renovation Project, collectively referred to as (“Kezar”). The CM/GC’s proposals are to include the CM/GC’s team of Core Trade Subcontractors to design-build the Mechanical, Plumbing, and Electrical (inclusive of low-voltage, fire alarm, telecommunications audio/visual and security) systems for the Project. The total fixed construction budget limit (“FCBL”) is $85 million, with an estimated direct construction cost at $70 million. The Project. Located at 755 Stanyan, San Francisco, CA 94117, the Kezar Pavilion Project will consist of the rehabilitation of the facility, with an addition of new annex Building construction on the same site. The structural seismic upgrade will be designed in accordance with the needs of an Essential Services Building per Risk Category IV requirements. The design is currently at 100% Schematic Design. Work shall identify and comply with all applicable codes, laws, rules, regulations, standards and ordinance requirements including requirements for an Essential Facility (as defined by the 2025 California Building Code as “buildings or other structures that are intended to remain operational in the event of extreme environmental loading from flood, wind, snow, or earthquakes”), accessibility, and sustainability. The scope of work is to include analysis and coordination to develop and maintain a strategy and check-list to achieve a minimum Leadership in Energy and Environmental Design (LEED) Gold certification by the Green Business Certification Inc. (GBCI) under LEED V4. Question Deadline 04/30/2026 at 12:00 PM PT Questions regarding the RFQP must be submitted in writing, via email, to Alexis Ward at alexis.ward@sfgov.org.

GC Bidding

Playgrounds / Parks / Athletic Fields

$70,000,000.00

Public - City

LEED Certification, Renovation

3

11

2

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2026

July 27, 2026

Project location map

755 Stanyan St, San Francisco, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.