BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2025 at 8:00 PM

Updated October 3, 2025

Site work and paving for a road / highway in Franklin Park, Illinois. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of October 2, 2025, per owner, engineer identified. Project will be let in the Spring of 2026. The Village of Franklin Park, Illinois ("Village") invites the submission of Statement of Qualifications (SOQ) from professional design and engineering services firms ("Respondents") for Phase 1 and Phase 2 Engineering for the "Grand Avenue at George Street Intersection Improvement Project ("Project"). The intent of the SOQ is to identify qualified Respondents having demonstrated experience, expertise and resources to provide the requested services as further described in the Project Scope. BACKGROUND The Village is requesting statements of qualifications from qualified professional engineering consultants to prepare and obtain approval for a Phase 1 intersection design study and project development report for the Grand Avenue at George Street Intersection Improvement Project, as well as Phase 2 design and preparation of construction plans, specifications, and contract documents for the Project. PROJECT SCOPE The Village is interested in improving the intersection of Grand Avenue and George Street through the evaluation and inclusion of a new traffic signal. Grand Avenue is a heavily traveled 4-lane arterial roadway running along a commercial corridor. The intersection of Grand Avenue and George Street is located approximately 1,000 feet East of the signalized intersection of Grand Avenue and Mannheim Road. This intersection provides access to a large commercial retail facility on the South side of Grand Avenue and a residential area to the North. The current intersection allows for unrestricted ingress and egress to and from the South. George Street to the North of Grand Avenue is a one-way street restricting Northbound traffic. The intersection to the West of George Street is a one-way Northbound roadway and the intersection to the East allows travel in both directions, neither is a signalized intersection. The Village is seeking to improve access and safety at the George Street intersection. Grand Avenue is a state highway, therefore any improvements at this location will require the approval of the Illinois Department of Transportation, as well as the Federal Highway Administration. The method of Contractor Selection has not been Determined at this time.

Design

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
481
Active Projects
263
Bidding Soon
3,482
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2026

Project location map

Grand Ave & Mannheim Rd, Franklin Park, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.