Site work and paving for a road / highway in Chula Vista, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

To provide and install asphalt and concrete coverings at various sites throughout the District as specified in the Bid documents. The covered work consists of furnishing all labor, material, equipment, transportation, and supervision for performing all necessary operations required for proper execution of scope of work as listed. In accordance with Public Contract Code section 20111, each bid shall be accompanied by cash, a cashier's or certified check, or a bidder's bond executed by an admitted surety insurer, made payable to the District, in an amount not less than ten percent (10%) of the maximum amount of the bid. The bid security shall be given as a guarantee that the Bidder to whom the Contract is awarded will execute the Contract Documents and will provide the required payment and performance bonds and insurance certificates within ten (10) days after the notification of the award of the Contract. A payment bond is required for a public works contract involving an expenditure in excess of twenty-five thousand dollars ($25,000.00). Separate payment and performance bonds, each in an amount equal to 100% of the total Contract amount, are required, and shall be provided to the District prior to execution of the Contract and shall be in the form set forth in the Contract Documents. All bonds (Bid, Performance, and Payment) must be issued by a California admitted surety insurer as defined in California Code of Civil Procedure section 995.120. The schedule of per diem wages is based upon a working day of eight (8) hours. The rate for holiday and overtime work shall be at least time and one half. Pursuant to Public Contract Code section 4100 et seq., each bid shall include the name, the location of the place of business, the California contractor license number, and public works contractor registration number of each Subcontractor who shall perform work or labor or render service or fabricate or install work for the contactor in excess of one-half of one percent (0.5%) of the contractor's total bid price. The bid shall describe the type of the work to be performed by each listed Subcontractor No bid may be withdrawn for a period of sixty (60) days after the date set for the opening for bids, except as provided by Public Contract Code section 5100 et seq. The District reserves the right to reject any and all bids and to waive any informalities or irregularities in the bidding Pursuant to Public Contract Code section 3300, the District requires that each Bidder must possess, at the time the Contract is awarded, the following classifications of California State Contractor's License: Class A, or B, or C-12 The Contractor's California State License number shall be clearly stated on the Bidder's proposal. Any Bidder not so duly and properly licensed shall be subject to all penalties imposed by law. No payment shall be made for work, labor, materials, or services provided under the Contract for the work unless and until the Registrar of Contractors verifies to the District that the Bidder awarded the Contract is properly and duly licensed to perform the work. The District's Board has found that the Project is substantially complex and therefore requires a standard retention amount of 5% of each progress payment.

Award

Roads / Highways

$1,898,395.00

Public - City

Paving, Site Work

3

11

2

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
42
Bidding Soon
507
All Active Projects
218
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

May 23, 2024

img_map_placeholder

Multiple Locations, Chula Vista, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.