BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2026 at 7:00 PM

Updated March 6, 2026

Renovation of a conference / convention center in Hanscom AFB, Massachusetts. Completed plans call for the renovation of a conference / convention center.

The work covered by these drawings and specifications includes the replacement of existing HVAC units AC-1 and AC-4, and controls for all HVAC units in Building B1106 (Conference Center). Related work includes the demo of the existing AC-4 mechanical closet and rebuilding larger mechanical closet for increased clearances around the mechanical equipment. Finishes are to match existing walls and doors. Two new (mechanical) ducts will pass through new structurally reinforced roof openings to provide supply outdoor air from above the roof. Remove and infill existing louvers at grade with matching wall assembly.

Post-Bid

Conference / Convention Centers

$100,000.00

Public - Federal

Renovation

29

54

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
11
Bidding Soon
2,697
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2026

July 6, 2026

Project location map

25 Grenier St, Hanscom AFB, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.