Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a power facility in Minneapolis, Minnesota. Conceptual plans call for the renovation of a power facility.
The Board of Regents of the University of Minnesota (the "University") is requesting Proposals to provide professional design services for replacement of the turbine control panel at the SE Steam Plant, located near the Twin Cities campus (the "Project"). The intent of this project is to replace the existing control system for a 13,800 volt turbine generator located at the SE Steam Plant. The turbine is a backpressure, steam driven turbine, rated at 16.425MW. The SE Steam Plant (SEP), in conjunction with the Main Energy Plant (MEP), are the sources of steam and electricity to the University of Minnesota east and west bank campuses. SEP houses decommissioned coal fired boilers, dual fuel package boilers, a circulating fluidized bed (CFB) boiler, and a 16.4 MW backpressure steam driven turbine generator that is currently out of service. Steam pressure is distributed from the plant to the main campus distribution system through the Grid Integrated Community Energy System (ICES) tunnel. SEP is owned by the University of Minnesota, but operated by Veolia North America under a third party contract with the university. Management of the Veolia contract and coordination of operations is performed within the university FM Energy Management department. Veolia is responsible for maintaining reliable operations, maintenance, safety and security of the facility. SEP is fed by one Xcel feeder (MST78) operating at 13,800 volts and a second University source (MHP-13) originating at the University owned Main Energy Plant. Both services terminate on a 15 kV main-tie-tie-main switchgear lineup in Vault A, which is located inside the plant. The plant normally operates with one utility source closed and both ties closed to provide power to the plant. The alternate source is normally available with the breaker open. The SEP electric turbine operates at 13,800 volts. It is connected to the 15kV main-tie-tie-main switchgear lineup in vault A, through a dedicated vacuum breaker. The existing turbine control panel is being replaced due to an unsynchronized generator breaker closure. This event resulted in mechanical damage to the turbine. Subsequent investigations failed to determine the specific cause. 1. Phase 1: Creation of As-Built Schematics and Wiring Diagrams for Existing Control Panel. a. Completion - July 12th, 2024 2. Phase 2: Design Phase / Front-End Engineering Document - The design phase shall include the standard design phases: Schematic Design, Design Development, and Construction Documents. The Respondent shall include a construction cost estimate for all Work at the completion of each design phase. a. Completion - December 6th, 2024 3. Phase 3: Bidding / Procurement and Construction Administration a. Completion - To be determined during Phase 2 4. Phase 4: Closeout a. Completion - To be determined during Phase 2 Question Deadline 04/09/2024 at 12:00 PM CT Before submitting questions about the RFP via the Questions Tab, read and review the RFX INSTRUCTIONS, REQUIREMENTS, AND RIGHTS RESERVED BY THE UNIVERSITY DOCUMENT and ALL Attributes in the Attributes Tab. These provide valuable information and address frequently asked questions. Anticipated Authorization to Proceed May 1, 2024 The method of Contractor Selection has not been Determined at this time.
Conceptual
Hydroelectric Power Generation
$230,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2024
600 SE Main St, Minneapolis, MN
Related To This Project
Minneapolis, MN
Bid Date: Apr 15 2024
Minneapolis, MN
Bid Date: Apr 16 2024
Minneapolis, MN
Bid Date: Dec 09 2021
Minneapolis, MN
Bid Date: Mar 29 2024
Minneapolis, MN
Bid Date: Apr 16 2024
Minneapolis, MN
Bid Date: Apr 15 2024
Minneapolis, MN
Bid Date: Apr 23 2024
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Apr 19 2024
Minneapolis, MN
Bid Date: Apr 18 2024
Minneapolis, MN
Bid Date: Mar 29 2024
Minneapolis, MN
Bid Date: Apr 25 2024
Minneapolis, MN
Bid Date: Apr 26 2024
Minneapolis, MN
Bid Date: Apr 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.