BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2025 at 7:00 PM

Updated March 1, 2025

Renovation of an educational facility in West Chicago, Illinois. Completed plans call for the renovation of a 14,225-square-foot educational facility.

Main Gym Floor Refinishing Project, which includes sanding, repair, refinishing, sealing, and painting at West Chicago Community High School. The Board of Education of Community High School District 94, West Chicago, Illinois seeks bids from vendors for the sanding, repair, refinishing, sealing and painting of our main gym floor. Scope of work includes sanding, repair, refinishing, sealing and painting of our main gym floor, which includes approximately 14,225 Net Square Feet. (a) Repair approximately 20 locations of boards with dead spots using caps or other recommended process. (b) Sand wood floor bare maple strip wood - tack clean. (i) The entire gym floor shall be machine and hand sanded as necessary to remove all existing game lines and finishes, and to a smooth surface. Contractor must use a minimum of 3 (40, 60 & 100 grit) types of sandpaper, and the floor must be sanded until it is uniformly dull. (c) Refinish the gym floor by applying (2) coats of sealer & (2) coats of finish. (i) Apply one coat of seal and allow to dry. (ii) Machine buff, vacuum and tack (iii) Apply second coat of seal and buff the floor (iv) Apply the gamelines an graphics and allow to dry (v) Abrade paint and buff. (vi) Apply one coat of floor finish and allow to dry (vii) Buff with steel wool and tack rag (viii) Apply a second coat of floor finish and allow to dry. (d) Final dusting and cleanup of areas will be by the owner. (e) The game lines and graphics shall be applied to match owner-approved drawings (f) The courts shall meet the requirements of the appropriate athletic associated as directed by the owner. (g) Line colors shall be selected from the manufacturer's standard colors as determined by the owner and the contractor. (h) All work is to be in accordance with the Maple Flooring Manufacturer's Association (MFMA) guidelines and recommendations. -Main Gym Floor Refinishing Alternate #1 - Stained 3pt Arcs on the Main Basketball Court Alternate #2 - IHSA Logos x 2 mirrored at Half Court Work is to be performed between the timeframe of June 12, 2025 and July 31, 2025.

Award

Educational

$92,710.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
455
Active Projects
244
Bidding Soon
3,363
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2025

June 12, 2025

Project location map

To Be Determined, West Chicago, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.