Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a sidewalk / parking lot in Huntington Park, California. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The City of HUNTINGTON PARK is soliciting Proposals from qualified and experienced consultants for architectural and engineering design services for the Project Approval & Environmental Design (PA&ED) phase in preparation for the solicitation of Plans, Specifications and Estimate (PS&E) from professionally licensed design consultants. The PA&ED constructability review assures that all of the alternatives and the proposed preferred alternative are constructible on the available level of detail. This review is particularly important during consultation with the California Environmental Quality Act (CEQA) that establishes project limits or place specific mitigation requirements on the project. The constructability review includes the review of the proposed work plan, schedule, environmental requirements, and construction impacts for CIP 2019-14 ATP Cycle VI. This program aims to provide safer routes for students attending twenty-two K-12 campuses within the project area where an average of 93% of students are enrolled in the Free and Reduced-Price Meal Program, and seniors accessing nearby medical offices and retirement communities by addressing current gaps in active transportation facilities that disproportionately affect students, seniors and other vulnerable populations living within this disadvantaged community. The reconstruction of 130 curb ramps to comply with ADA-standards and the installation of new high visibility crosswalks near twenty-two project area schools will increase motorist visibility and pedestrian safety for students at school campus crossings, and the installation of a new, pedestrian controlled HAWK beacon will increase safety and comfort for students and parents commuting to the nearby Middleton Elementary and Primary Center. Additionally, the construction of three raised islands around Chelsey Park will increase pedestrian safety and comfort when accessing recreational amenities and other nearby after-school activities and health services for students and seniors. Other improvements contained within this project include 3,266 LF of new sidewalks and extensive updates to walking/biking paths adjacent to Veteran's Park, one of the City's largest green spaces, including the installation of 20 wayfinding signs, 10 flashing beacons, 329 illuminated bollards, 20 speed humps, 10 raised crosswalks, and new active transportation amenities for commuters including waste bins, benches, and shade trees along the areas where the walking and biking paths meet the street and are exposed to vehicular traffic. These critical ATP updates will encourage children and parents to walk to school, and increase student access to parks, libraries, and other after school activities, helping reduce transportation costs and greenhouse gas emissions, while also reducing social isolation which is a major contributor of poor health in an area with healthier community conditions than only 12% of other CA cities (HPI). All questions regarding this RFP must be submitted via email: Steve Forster, Acting Director of Public Works E-mail: sforster@hpca.gov Questions regarding this proposal shall be submitted via email by 5:00 PM, April 3, 2024. In response to all questions received by this date, City will issue an Addendum no later than 5 days prior to the proposal submittal due date. The addendum will be emailed to all RFP recipients on record.
Conceptual
Sidewalks / Parking Lot
$505,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2024
Multiple Locations, Huntington Park, CA
Related To This Project
Huntington Park, CA
Bid Date: Nov 18 2020
Huntington Park, CA
Bid Date: May 20 2024
Huntington Park, CA
--
Huntington Park, CA
--
Huntington Park, CA
--
Huntington Park, CA
Bid Date: Aug 23 2024
Huntington Park, CA
--
Huntington Park, CA
--
Huntington Park, CA
Bid Date: Apr 24 2024
Huntington Park, CA
--
Huntington Park, CA
Bid Date: Apr 24 2024
Huntington Park, CA
Bid Date: Feb 01 2024
Huntington Park, CA
Bid Date: Feb 07 2024
Huntington Park, CA
Bid Date: Feb 06 2024
Huntington Park, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.