Published May 6, 2024 at 8:00 PM

Updated May 7, 2024

Site work and paving for a road / highway in Marion, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.

54 SY of pavement removal, 17 SY of 7'PCC pavement, 37 SY 8' Colored PCC Pavement, 1401 SY Full Depth PCC Patches, 21786 LF of Creak and Joint Cleaning and Filling Hot Pour, 60 EA Dowel Bar Retrofit, 1821 EA Cross Stitch Tie Bar and miscellaneous related work and appurtenances in accordance with the contract documents. Project work is specified to begin no later than July 8, 2024, and be completed within 80 working days. Liquidated damages in the amount of $300.00 per working day will be assessed for each working day in excess of the specified date and time. 10/4. Engineer's Estimate: $422,800.00 For plans contact: Jenni Stark Project Assistant 319.743.6340 jstark@cityofmarion.org For project questions contact: Seth Kjormoe, PE Project Manager 319.743.6340 skjormore@cityofmarion.org The City of Marion reserves the right to defer acceptance of any bid for a period not to exceed thirty (30) days after receipt of bids, and no bid may be withdrawn during this period. Each successful bidder shall be required to furnish a corporate surety bond in an amount equal to one hundred percent (100%) of its contract price. Said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the contract. Upon completion of the project and before final acceptance by the City Council, the contractor will be required to post a maintenance bond (2-year for sewer or 4-year for paving) or be required to pay the City 1.5 percent of the final contract amount to pay for the applicable maintenance bond. Such 1.5 percent shall not be refundable to the contractor and the City will act as the bonding agent. Posting of the maintenance bond or the cash payment will be the election of the City Engineer, all in accordance with Ordinance 77-21 of the City of Marion. The City does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.

Award

Roads / Highways

$321,886.00

Public - City

Paving, Site Work

23

5

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
94
Bidding Soon
1,119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

July 8, 2024

Project location map

Multiple Locations, Marion, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.