BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2024 at 8:00 PM

Updated August 15, 2025

This is a service / maintenance or supply contract in Tennille, Georgia. Contact the soliciting agency for additional information.

Deadline for submission of written questions and requests for clarification 3/29/2024 2:00 PM Deadline for submission of written questions and requests for clarification 3/29/2024 2:00 PM Questions about any aspect of the RFQ, or the project, shall be submitted in writing via e-mail to: Melissa Hannah, e-mail: mehannah@dot.ga.gov. The deadlines for submission of questions relating to the RFQ are the times and dates shown in the (Schedule of Events- Section III). From the issue date of this solicitation until a successful proposer is selected and the award is made official and announced, respondents are subject to the Restriction of Communication in Section I.B. There is one (1) electronic version submittal required. The Submittal must follow the format and meet the content requirements identified in Section VII, entitled Instructions for Preparing Technical Approach and Past Performance Response - Phase II Response. See Attachment 1 for a summary of how the submittals should be prepared. B. Submittals must be typed on standard (8 1/2 " x 11") paper. The pages should be numbered; however, submittal pages will be counted by section to determine compliance with page limits. Responses are limited to the page counts indicated in each section using a minimum of size 11 font. Page counts will be determined by pages with print on them, not by the physical piece of paper. Each Statement of Qualifications shall be prepared simply and economically as indicated above. Colored displays, and promotional materials are not desired. Emphasis must be on completeness, relevance, and clarity of content. Contract Term and Type GDOT anticipates one (1) On-Call Indefinite Delivery, Indefinite Quantity Contract to be awarded to one (1) firm, for the project/contract identified. GDOT anticipates that the Payment Type may be Lump Sum, Cost Plus Fixed Fee, Cost per Unit of Work or Specific Rate of Compensation. As an On-Call Indefinite Delivery, Indefinite Quantity contract, the Agreement will remain in effect for three (3) years, with the option to extend the contract for up to a maximum of five (5) years Contract Amount The On-Call, Indefinite Delivery Indefinite Quantity contract will have a minimum dollar amount of Twenty-Five Thousand Dollars ($25,000.00) and a maximum dollar amount of Thirty Million Dollars ($30,000,000.00).

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
83
Bidding Soon
950
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

Project location map

Multiple Locations, Tennille, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.