BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, remodeling and renovation of an educational facility in Plano, Texas. Completed plans call for the remodel of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The Work of Project is defined by the Contract Documents and consists of Additions and Renovations to Beaty Early Childhood School for the Plano Independent School District. Project consist of adding a new Kitchen and Activity Room and renovating the existing Dining Room. The work includes: All new kitchen equipment. Replace valves at sprinkler system. All new building HVAC controls. Replace existing chiller, pumps and boiler, and add a second chiller. Upgrade marquee to digital. Provide appropriate signage directing visitors to visitor parking. Add access control key cards at exterior doors from classrooms to playgrounds. Send all bids and questions to estimating@mdigc.com No oral interpretations will be made to any Proposer as to the meaning of the drawings and specifications. Every request for such an interpretation shall be made in writing and addressed and forwarded to the Construction Manager. No inquiry received within five (5) business days of the date fixed for opening of proposal will be given consideration Wednesday, April 3, 2024 by 4:00 PM. All questions should be directed to MDI General Contractors at estimating@mdigc.com. All questions will be answered via addendum. Do not contact the Owner or Architect Adding an approximate 5,600 SF addition to the 42,100 SF building, renovating 4,100 SF, and making other improvements throughout. All new kitchen equipment. Replace valves at fire sprinkler. All new building HVAC controls. Replace existing chiller, pumps and boiler, and add a second chiller. Upgrade marquee to digital. Provide appropriate signage directing visitors to visitor parking. Provide additional wiring for cameras so pick up area can be monitored from inside. Provide wiring for cameras at a few interior locations where security cameras were not seen. Add access control key cards at exterior doors from classrooms to playgrounds. The overall Construction Schedule is 14 months. Improvements in occupied spaces will be scheduled for summer of 2025 including the Dining Room renovation, the HVAC work on the existing building, and sprinkler valves.

Post-Bid

Educational

Public - City

Remodeling, Renovation, Site Work

113

34

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
100
Bidding Soon
3,579
All Active Projects
1,419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.