Renovation of a mixed-use development in Pasadena, California. Completed plans call for the renovation of a educational facility.

**As of September 06, 2024 This project has been awarded to NETWORK INTEGRATION COMPANY PARTNERS, with the awarded amount of $375,202.91.** Scope of Work: Owner Furnished Contractor Installed (OFCI) Verkada Equipment as specified in the bidding documents. The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and complete all work required in connection with the Digital Camera Replacement Project ("Project") in strict accordance with the Contract Documents enumerated in Article 7 below. The Contractor shall be liable to the District for any damages arising as a result of a failure to comply with that obligation, and the Contractor shall not be excused with respect to any failure to so comply by an act or omission of the Architect, Engineer, Inspector, Division of the State Architect (DSA), or representative of any of them, unless such act or omission actually prevents the Contractor from fully complying with the Contract Documents and the Contractor protests, in accordance with the Contract Documents, that the act or omission is preventing the Contractor from fully complying with the Contract Documents. Such protest shall not be effective unless reduced to writing and filed with the District office within seven (7) days of the date of occurrence of such act or omission preventing the Contractor from fully complying with the Contract Documents. Replacement of Existing Cable by Linear Feet Troubleshooting Existing Cable Installation of camera Each Bidder shall possess at the time this Contract is awarded a Class B or C-7 Contractor's License, current and legally issued by the Contractor's State License Board, pursuant to Public Contract Code Section 3300. The successful bidder must maintain the license In good standing throughout the duration of this Contract. All General Contractors and Mechanical, Electrical, and Plumbing (M/E/P) Subcontractors must be pre-qualified for this project per bidding documents. Prequalification Due Date and Instructions for Application Submission: All applications are due no later than July15, 2024. Pasadena Unified School District has contracted with Colby Technologies, Inc to provide a web-based process for prequalification called Quality Bidders. Pasadena Unified School District is an "Equal Opportunity" employer. Qualified Disabled Veteran Business Enterprises (DVBE) are encouraged to participate in this project. In accordance with California Public Contract Code section 22300, the District will permit the substitution of securities for any moneys withheld by the District to ensure performance under the General Contract. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the District. or with a state or federally chartered bank as the escrow agent, who shall then pay such moneys to the Contractor. Upon satisfactory completion of the General Contract, the securities shall be returned to the Contractor. The Escrow Agreement for Security Deposit in Lieu of Retention form that must be utilized by the Contractor is on file at the office of the Director, Procurement & Contracts and is consistent with the terms of Public Contract Code section 22300(1). A contractor or subcontractor shall not be qualified to bid on, be Listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in the Labor Code, unless currently registered and qualified to perform public work pursuant to Labor Code section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor Is registered to perform public work pursuant to Section 1725.5 at the fime the contract is awarded. Unless specifically exempted by the Labor Commissioner for this Project, the Contractor and all subcontractors shall also furnish certified payroll records as required pursuant Labor Code section 1776 directly to the Labor Commissioner in accordance with Labor Code section 1771.4 on at least a monthly basis (or more frequently required by the District or the Labor Commissioner) and in a format prescribed by the Labor Commissioner. Unless specifically exempted by the Labor Commissioner for this Protect, monitoring and enforcement of the prevailing wage laws and related requirements will also be performed by the Labor Commissioner/ Department of Labor Standards Enforcement (DLSE). Liquidated Damages $250.00 Per Calendar Day Estimated Bid Value $500,000.00 to $1,000,000.00 Project Duration 99 Days Bid Bond 10.00% Payment Bond 10.00% Performance Bond 10.00% Request for Information Deadline: July 15, 2024 no later than Noon *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Allendale Elementary School A. The total number of security cameras to be replaced in this phase is 9. B. The existing cameras identified on the Allendale Site Map are to be removed along with the mounting hardware that is no longer needed for the upgraded camera. C. Verkada Mounting hardware will be provided by the District. D. The Allendale Site Map shows the location of each camera along with the number-name. E. Cameras with name-location,height andpictureare below as followed. The contractor will need to field verify the camera ID name before starting the work. F. A new camera naming convention will be provided by the District. 1. Camera #282, Building A exterior, view facing northwest. The camera is 9ft high. 2. Camera #196, Building A exterior, view facing east towards the walkway. The camera is 10ft high. 3. Camera #195, Building Site Plan T3 exterior, view facing north. The camera is 13ft high. 4. Camera #Verkada, Building Site Plan T3 exterior, the camera is 10ft high. 5. Camera #281, Building G & G1 exterior, view of the hallway south. The camera is 10ft high. 6. Camera #280, Building G & G1 exterior, view of the hallway north. The camera is 10ft high. Altadena Elementary School - 1. Camera #246, Building A and C Building, view of the lobby area. The camera is 10ft high. 2. Camera #247, Building A and C Building exterior, view facing the front gate. The camera is 10ft high. 3. Camera #248, Building A and C Building, view facing west of the hallway. The camera is 8ft high. 4. Camera #249, Building A and C Building, view facing north of the hallway. The camera is 8ft high. 5. Camera #250, Building A and C Building, view facing the stairwell and exit. The camera is 8ft high. Camera #220, Building A and C Building, view of the dining area. The camera is 9ft high. Blair High School A. The total number of security cameras to be replaced in this phase is 51. B. The existing cameras identified on the Blair Site Map are to be removed along with the mounting hardware that is no longer needed for the upgraded camera. C. Verkada Mounting hardware will be provided by the District. D. The Blair Site Map shows the location of each camera along with the numbername. E. Cameras with name-location,height andpictureare below as followed. The contractor will need to field verify the camera ID name before starting the work. F. A new camera naming convention will be provided by the District. District Service Center (DSC) A. The total number of security cameras to be replaced in this phase is 36. B. The existing cameras identified on the DSC Site Map are to be removed along with the mounting hardware that is no longer needed for the upgraded camera. C. Verkada Mounting hardware will be provided by the District. D. The DSC Site Map shows the location of each camera along with the numbername. E. Cameras with name-location,height andpictureare below as followed. The contractor will need to field verify the camera ID name before starting the work. F. A new camera naming convention will be provided by the District. Education Center (ED Center) A. The total number of security cameras to be replaced in this phase is 13. B. The existing cameras identified on the ED Center Site Map are to be removed along with the mounting hardware that is no longer needed for the upgraded camera. C. Verkada Mounting hardware will be provided by the District. D. The Ed Center Site Map shows the location of each camera along with the number-name. E. Cameras with name-location,height andpictureare below as followed. The contractor will need to field verify the camera ID name before starting the work. F. A new camera naming convention will be provided by the District. 1. Camera #506, Building A 1 st floor exterior, view facing east towards the parking lot and front entrance. The camera is 9ft high. 2. Camera #347, Building A 1 st floor exterior, view facing east towards the entrance to the parking lot. The camera is 9ft high. 3. Camera #349, Building B 1 st floor exterior, view facing northeast towards the entrance to the parking lot. 4. Camera #6, Building C 1 st floor, view facing east toward the double exit doors. The camera is 9ft high. 5. Camera #7, Building C 1 st floor, view facing west toward the hallway leading to building B. The camera is 9ft high. 6. Camera #342, Building C 1 st floor exterior, view facing the entrance from Hudson St. The camera is 11ft high.

Award

Educational

$375,203.00

Public - County

Renovation

100

15

2

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
120
Bidding Soon
2,194
All Active Projects
1,013
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2024

September 9, 2024

img_map_placeholder

Multiple Locations, Pasadena, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.