BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of an educational facility in Wentzville, Missouri. Working plans call for the remodel of a educational facility.

**As of May 14,2024 bids were canceled. No definite date for the rebid.** SUMMARY OF WORK The work of this contract comprises the HVAC Equipment Replacement at Boone Trail Elementary School, Wentzville School District. Construct the work under a stipulated sum. All work on the project shall be executed as part of the work of this contract. PROJECT COORDINATION D. E. F. G. H. I. 1.4 JOB SITE PROGRESS MEETINGS A. PROJECT NO. 23-06J - SECTION 01000 - PAGE 1 Section 00800 - Supplementary Conditions. Section 01035 - Alteration Work Procedures. Section 01700 - Contract Close-Out Procedures. SECTION 01000 - GENERAL PROVISIONS 1. GENERAL B. C. A. B. C. The work of this contract comprises the HVAC Equipment Replacement at Boone Trail Elementary School, Wentzville School District. Construct the work under a stipulated sum. All work on the project shall be executed as part of the work of this contract. (1) Owner's Representative. (2) General Contractor's Project Manager. (3) General Contractor's Superintendent. (4) Subcontractors/material suppliers. Sub-subcontractors, those presently working on site. (5) Subcontractors/material suppliers. Those required on site within two weeks. The Contractor shall coordinate the work, including the work of all subcontractors forthe project. The Contractor shall schedule and conduct progress meetings. Note that the existing building on this site must remain in operation during construction and EVERY PRECAUTION MUST BE TAKEN TO PREVENT INTERRUPTION OF SERVICES. All work which requires the interruption of existing utility services, to the existing building(s), shall be performed at times when the buildings are not in use by the Owner, and when the Contractor has received the prior approval of the Architect. The Contractor is responsible for all overtime, weekend, or other premium time required to complete this project. No trade items (i.e.: piping, ductwork, conduit, etc.) are to be installed below the HVAC Equipment. This will allow for maintenance and replacement of the HVAC Equipment in the future. All HVAC units, controls, fire alarms, circuits, etc., shall be properly labeled with the appropriate room number. All HVAC equipment to include a plastic laminate I.D. applied sign. Same for Electrical panels. Priorto start offield work, the Owner Architect shall hold a pre-construction conference at the site in a location to be designed, in order to discuss coordination, procedures, routing ofdelivery trucks, location ofstorage areas, requirements for Contractor's parking of vehicles, barricades, security and scheduling. All work shall be coordinated with the existing school operations. Some of the construction activities may need to take place before or after school hours, or on the weekends. The contractor's team shall include in their bid any additional costs associated with early start *As of April 1, 2024, addendum 1 has been issued.

Final Planning

Educational

$200,000.00

Public - City

Remodeling

59

28

17

2

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
58
Bidding Soon
903
All Active Projects
353
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

November 14, 2024

img_map_placeholder

555 East Hwy N, Wentzville, MO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.