Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Remodeling of an educational facility in Wentzville, Missouri. Working plans call for the remodel of a educational facility.
**As of May 14,2024 bids were canceled. No definite date for the rebid.** SUMMARY OF WORK The work of this contract comprises the HVAC Equipment Replacement at Boone Trail Elementary School, Wentzville School District. Construct the work under a stipulated sum. All work on the project shall be executed as part of the work of this contract. PROJECT COORDINATION D. E. F. G. H. I. 1.4 JOB SITE PROGRESS MEETINGS A. PROJECT NO. 23-06J - SECTION 01000 - PAGE 1 Section 00800 - Supplementary Conditions. Section 01035 - Alteration Work Procedures. Section 01700 - Contract Close-Out Procedures. SECTION 01000 - GENERAL PROVISIONS 1. GENERAL B. C. A. B. C. The work of this contract comprises the HVAC Equipment Replacement at Boone Trail Elementary School, Wentzville School District. Construct the work under a stipulated sum. All work on the project shall be executed as part of the work of this contract. (1) Owner's Representative. (2) General Contractor's Project Manager. (3) General Contractor's Superintendent. (4) Subcontractors/material suppliers. Sub-subcontractors, those presently working on site. (5) Subcontractors/material suppliers. Those required on site within two weeks. The Contractor shall coordinate the work, including the work of all subcontractors forthe project. The Contractor shall schedule and conduct progress meetings. Note that the existing building on this site must remain in operation during construction and EVERY PRECAUTION MUST BE TAKEN TO PREVENT INTERRUPTION OF SERVICES. All work which requires the interruption of existing utility services, to the existing building(s), shall be performed at times when the buildings are not in use by the Owner, and when the Contractor has received the prior approval of the Architect. The Contractor is responsible for all overtime, weekend, or other premium time required to complete this project. No trade items (i.e.: piping, ductwork, conduit, etc.) are to be installed below the HVAC Equipment. This will allow for maintenance and replacement of the HVAC Equipment in the future. All HVAC units, controls, fire alarms, circuits, etc., shall be properly labeled with the appropriate room number. All HVAC equipment to include a plastic laminate I.D. applied sign. Same for Electrical panels. Priorto start offield work, the Owner Architect shall hold a pre-construction conference at the site in a location to be designed, in order to discuss coordination, procedures, routing ofdelivery trucks, location ofstorage areas, requirements for Contractor's parking of vehicles, barricades, security and scheduling. All work shall be coordinated with the existing school operations. Some of the construction activities may need to take place before or after school hours, or on the weekends. The contractor's team shall include in their bid any additional costs associated with early start *As of April 1, 2024, addendum 1 has been issued.
Final Planning
Educational
$200,000.00
Public - City
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2024
November 14, 2024
555 East Hwy N, Wentzville, MO
Related To This Project
Wentzville, MO
--
Wentzville, MO
Bid Date: Apr 18 2024
Wentzville, MO
Bid Date: Apr 03 2024
Wentzville, MO
Bid Date: Apr 08 2024
Wentzville, MO
Bid Date: Apr 09 2024
Wentzville, MO
Bid Date: Apr 12 2024
Wentzville, MO
Bid Date: Apr 12 2024
Wentzville, MO
Bid Date: May 10 2024
Wentzville, MO
Bid Date: Apr 16 2024
Wentzville, MO
Bid Date: Mar 25 2024
Wentzville, MO
Bid Date: Mar 21 2024
Wentzville, MO
Bid Date: Apr 19 2024
Wentzville, MO
Bid Date: Mar 15 2024
Wentzville, MO
Bid Date: Apr 23 2024
Wentzville, MO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.