BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 23, 2025 at 7:00 PM

Updated January 15, 2026

Site work and paving for a mixed-use development in Orlando, Florida. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of December 23, 2025, an engineer has been selected and the project is currently in the design phase. Design completion is expected in late 2026, with bidding anticipated in late 2027. Construction is projected to begin in early 2028 and conclude around 2030. *The closed solicitation has been included below for reference: Central Florida Expressway Authority (CFX) requires the services of Professional Engineering Consultants to prepare construction drawings / specifications for the construction of the SR 417 southbound ramp extension from Boggy Creek Road to Landstar Blvd.

Design

Roads / Highways

$102,698,000.00

Public - State/Provincial

Paving, Site Work

3

3

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
295
Active Projects
124
Bidding Soon
2,046
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.