BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Madisonville, Kentucky. Completed plans call for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; for paving for a bridge / tunnel; playground / park / athletic field; playground / park / athletic field; playground / park / athletic field; road / highway; road / highway; and road / highway.

**As of May 9, 2024 project has been awarded to Sharco Paving with the amount of $139,878.11.** The City of Madisonville is soliciting bids for the refurbishment and paving of approximately 1450 feet of the City Park Walking Trail, with the Madisonville City Park. The project will consist of excavation, engineered fill, culvert installation, construction of a wooden bridge, sediment control and reseeding and paving. Removal of existing lighting and installation of new lighting will be by the City of Madisonville. Proposals must be accompanied by a five percent (5%) Bid Bond. No bidder may withdraw a bid for a period of ninety (90) days after the date set for the opening of bids. The successful bidder will be required to furnish the Owner with a 100% Performance and Material Payment Bond. The Owner may consider informal any bid not prepared and submitted in accordance with the provisions hereof and may waive any informalities or reject any and all bids. Liquidated Damages for Failure to Enter into Contract: The successful bidder, upon his/her failure or refusal to execute and deliver the contract required within ten (10) days after he/she has received notice of the acceptance of his/her bid, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the bid bond and the right to bid on future projects for the period of five (5) year. Time of Completion and Liquidated Damages: Bidder must agree to commence work on or before a date specified in a written "Notice to Proceed" of the Owner and to fully complete the project within ninety (90) consecutive calendar days thereafter. Otherwise the Bidder agrees to pay as liquidated damages for non-weather-related construction delays, the sum of $500.00 for each consecutive calendar day thereafter as hereinafter provide in the General Conditions.

Award

Playgrounds / Parks / Athletic Fields

$139,878.00

Public - City

Outdoor Lighting, Paving, Site Work

12

7

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
18
Bidding Soon
447
All Active Projects
186
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

May 16, 2024

img_map_placeholder

755 Park Ave Ct, Madisonville, KY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.