BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Bonny Doon, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Resurfacing project. General work description: CSA No. 24 - 2-inch Asphalt Overlay. Pineridge Road off Empire Grade in Bonny Doon, see chart below for locations (Areas marked in white paint in the field, numbered 1 through 6). This project involves the construction placement of 2-inch asphalt concrete (AC) overlay on Pineridge Road. Preparatory work shall include cleaning the surface, removing debris, applying tack coat surface oil and filling in low areas with approximately four tons of leveling course of hot mix AC to a flat grade. Overlay 35,895 square feet of road with approximately 449 tons of 1/2 inch AC hot mix at a depth of 2-inch compacted and rolled to finish. All spoils to be hauled off site and disposed in a proper manner. There are 90 working days in this contract. The estimated cost of the project is $100,000 The successful bidder/contractor shall furnish a Class "A" or "C-12" California State license and the required insurance coverage at the time this contract is awarded, and during the duration of the project. The Department of Public Works hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids and will not be discriminated against on the grounds of race, color or national origin in consideration for this award. Question Submission Deadline: April 5, 2024, 2:00pm Question Response Deadline: April 12, 2024, 5:00pm Contractor Selection Date: April 19, 2024

Award

Roads / Highways

$80,696.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
58
Bidding Soon
1,280
All Active Projects
551
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

May 20, 2024

img_map_placeholder

Pineridge Rd, Bonny Doon, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.