BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2024 at 8:00 PM

Updated April 10, 2024

Site work for a road / highway in Snowmass Village, Colorado. Completed plans call for site work for a road / highway.

Reference Number 0000347190 Project Number: PW Roadway Stripping 2024 Questions Closing Date 3/24/2024 at 3 PM Local Time The Town of Snowmass Village Public Works Road Division contracts twice a year for the placement of pavement markings. The striping will be on the main arteries and some arterial roadways. The first application is in May (Spring), and the second application is in early October (Fall). This project is intended to conform to the town's aesthetic and design specifications, which are found below. Anticipated Award and Executed Contract Week of 4/15/2024 Anticipated Notice to Proceed Week of 4/17/2024 Anticipated Completion of Project 10/16/2024 The Town in its sole and absolute discretion, may reject any or all Bids or cancel and withdraw this RFQ or the Project at any time or for any reason, and may, in its sole and absolute discretion, waive any non-conformance or non-compliance with the requirements specified in this RFQ.

Post-Bid

Roads / Highways

$395,800.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
9
Bidding Soon
182
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

May 15, 2024

Project location map

Multiple Locations, Snowmass Village, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.