BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Cherry Point, North Carolina. Completed plans call for the renovation of a transportation facility.

This procurement is restricted to the M&R MACC contractors. Only the M&R MACC contractors listed on the RFP cover letter may submit a proposal. See attached documents for scope of work and any applicable drawings. Contract Completion Date: All work shall be completed within 90 calendar days after award. Estimated Cost Range: Less than $25,000. Liquidated Damages: $13.00 per Calendar Day Requests for Information (RFIs): RFIs must be submitted to the email addresses above. The cut off for RFIs is 8 April 2024 by 9:00 AM in order to process all inquiries by the proposal due date. The work includes to rehab the OLS control box B8111 and incidental related work. 1. The intent of this work order is for the contractor (CTR) to rehab the OLS control box B8111. 2. The work time will have to be scheduled through Bogue Field Operations, through the PAR. 3. The Par will have to coordinate with the Marine's, to remove all their equipment from the control box prior to the commencement of work. 4. The CTR shall barricade off the work area, and install proper signage to keep area safe, all work will be performed in a fall risk area, CTR shall have proper PPE to perform task. 5. The CTR shall lockout/tagout power to the control box prior to commencement of work. 6. The CTR shall all remove interior shelving, and window unit, and save to be reused. Once removed the interior paneling shall be removed and disposed of off MCAS property. 7. The CTR shall remove exterior wall panels and dispose of off MCAS property. 8. The CTR shall remove interior flooring and dispose of off MCAS property. 9. The CTR shall install new interior and exterior 1/2 plywood wall panels, to include cutouts for existing electrical outlets, communication wiring, windows, and door. The CTR shall install new floor joist and replace the flooring with 3/4 plywood the bottom of the floor plywood shall be sealed with a water sealer like and kind to (Seal-Once Marine Premium Wood Sealer) or better, to protect from the elements. 10. Once the walls are complete the CTR shall paint with 2 coats of white exterior paint/ primer mix, once paint is dry the CTR shall paint a coat of primer, once dry Once all the walls are complete reattach all equipment that was removed from the walls. The CTR shall apply 2 coats of nonskid paint on the floor in a sand beige color. 11. The Exterior wall shall have white fiberglass reinforced plastic wall panels installed over the plywood, once install the CTR shall seal and caulk all seams, window, and door seams with exterior seal/ caulk. 12. The CTR shall reseal all roof seams. 13. Perform multiple leak tests to ensure all panels are sealed properly. 14. Removal of old equipment, debris and trash shall be removed and properly disposed of off MCAS Cherry Point base/government property. 15. Prior to leaving site, contractor shall conduct site cleanup and return area to its original condition. After Inspection and approval, turn all paperwork into the Contracting Officers Representative.

Post-Bid

Transportation Terminals

$25,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
49
Bidding Soon
579
All Active Projects
264
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 17, 2024

May 17, 2024

August 15, 2024

img_map_placeholder

100 Roosevelt Blvd, Cherry Point, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.