Site work and paving for a mixed-use development in Novi, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project consists of the removal and replacement of various concrete neighborhood roads throughout the City of Novi in 2024 and 2025. The work will also include excavation and replacement of aggregate base course, placement of underdrain, adjustment of catch basins, and ADA sidewalk work. The approximate quantities of the major items of work for 2024 are: 1 - LSUM - Mobilization (10% Max.) 1 - LSUM - Pre-Construction Audio Visual 8,462 - Syd - Pavt, Rem, Modified 380 - Syd - Pavt, Repr Rem 8,296 - Syd - Conc Pavt with Integral Curb, Nonreinf, 8 inch 380 - Syd - Conc Pavt, Full Depth, Slab Repair 4,414 - Ft - Underdrain, Subgrade, Open-Graded, 6 inch 9,136 - Syd - Aggregate Base, 21AA Limestone, 8 inch 7,374 - Syd - Tensar TX5 Geogrid 1,303 - Sft - Curb Ramp, Conc, 6 inch 1 - LSUM - Maintaining Traffic 1 - LSUM - Surface Restoration The approximate quantities of the major items of work for 2025 are: 1 - LSUM - Mobilization (10% Max.) 1 - LSUM - Pre-Construction Audio Visual 15,395 - Syd - Pavt, Rem, Modified 227 - Syd - Sidewalk, Rem, Modified 15,108 - Syd - Conc Pavt with Integral Curb, Nonreinf, 8 inch 6,394 - Ft - Underdrain, Subgrade, Open-Graded, 6 inch 16,670 - Syd - Aggregate Base, 21AA Limestone, 8 inch 12,542 - Syd - Tensar TX5 Geogrid 1,537 - Sft - Curb Ramp, Conc, 6 inch 64 - Ft - Sewer, Rem, Less than 24 inch 3 - Ea - Dr Structure, Rem 4 - Ea - Dr Structure, 24 inch 3 - Ea - Dr Structure, 48 inch 181 - Ft - Sewer, Cl A, 12 inch, Tr Det B 1 - LSUM - Maintaining Traffic 1 - LSUM - Surface Restoration The project will be financed with local funds. Bid Security in the amount, form, and subject to the conditions provided in the Instructions to Bidders must be submitted with each Bid. Bids may not be withdrawn for a period of 120 days after the actual date of opening thereof. This time period may be extended by mutual agreement of the OWNER and any Bidder or Bidders. The City reserves the right to accept any or all alternative Bids and award the contract to other than the lowest bidder, to waive any irregularities or informalities or both; to reject any or all Bids; and in general to make the award of the Contract in any manner deemed by the City, in its sole discretion, to be in the best interest of the City of Novi. A Bid must be accompanied by Bid security made payable to OWNER in an amount of 5% of Bidder's maximum Bid price. The required security must be in the form of a certified or bank cashier's check made payable to the City of Novi or a Bid bond by a surety licensed to conduct business in the State of Michigan and named in the current list of "Surety Companies Acceptable on Federal Bonds" as published in the Federal Register by the Audit Staff Bureau of Accounts, U.S. Treasury Department. Attorneys-in-fact who execute the Bid Security or Bid Bond on behalf of the Surety shall affix to the bond a certified and copy of the power of attorney. The Bid security of the successful Bidder will be retained until the Agreement has been executed and the successful bidder has furnished the required Contract security, whereupon Bid Security will be returned. If Bidder fails to execute and deliver the Agreement and furnish the required Contract security within ten days of receipt of the Notice of Award, OWNER may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid Security of any Bidder whom OWNER believes to have a reasonable chance of receiving the Award may be retained by the OWNER until the earlier of the seven (7) days after the effective date of the Agreement or 120 days after the Bid opening. Bid Security of other Bidders will be returned within seven (7) days of the Bid opening. Contractor shall furnish performance and payment bonds, each in an amount at least equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. These bonds shall remain in effect until one year after the date when final payment becomes due or until completion of the correction period specified in Paragraph 13.07, whichever is later, except as provided otherwise by Laws or Regulations or by the Contract Documents. Contractor shall also furnish such other bonds as are required by the Contract Documents. Question Deadline 04/09/2024. All questions about the meaning or intent of the Contract Documents shall be submitted to the ENGINEER in writing at the address listed on the cover of this document or via email to: mark.koskinen@aecom.com Replies will be issued by Addenda and mailed or delivered to all parties recorded by the ENGINEER as having received the Bidding Documents. Questions received less than seven (7) days prior to the date of opening of Bids will not be answered. Only those questions that are answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. ADDENDA Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed by OWNER or ENGINEER. Any addenda issued during the time of bidding or forming a part of the Contract Documents shall be included in the Bid and shall be made a part of the Contract Documents. Receipt of each Addendum shall be acknowledged in the Bid. Failure by the Contractor to meet the interim or final completion dates specified above will result in the contractor being assessed liquidated damages in the amount $800.00 per calendar day. Liquidated damages will be assessed separately, simultaneously and concurrently for the failure to meet interim and/or final completion dates. Liquidated damages will continue to be assessed for each calendar day that the work associated with interim or final completion date remains incomplete, even if these days extend into or beyond the normal season suspension period as specified in the 2020 MDOT Standard Specification for Construction, unless approved otherwise by the Engineer.

Post-Bid

Roads / Highways

$3,000,000.00

Public - City

Paving, Site Work

51

8

4

2

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
203
Bidding Soon
2,743
All Active Projects
1,091
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.