Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 13, 2024 at 8:00 PM
Updated May 22, 2024
Site work and new construction of a pre-engineered storage facility in Dundee, Michigan. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
Site prep and installation of a 60' wide x 50' deep x 16' H (interior) pole barn structure. - The 60' side will be the gable end - Post concrete - Metal siding and metal roof - There would be an interior wall separating the 60'x50' interior into two 30'x50' sections - Two 16' x 14' overhead doors on the front - one for each section - Two 36" walk through doors on the front - one for each section - Two 12'x12' overhead doors on the back - one for each section - Walk through door on the interior wall; more of a French door (but durable) set up here where we could open the doors up to create a wider opening - Incorporate translucent wall panels along the top of the structure to allow natural light in - 3 sliding windows on both the east and west sides (6 total windows) Dundee Community Schools reserves the right to reject any or all proposals and bids, including that of the lowest bidder; or to accept bids either in whole or in part; to award contracts by individual items or by lump sum total; or to waive any informalities, defects or omissions in any bid, should it be deemed to be in the best interest of Dundee Community Schools to do so. The proposal must be accompanied by a certified check or bid bond by an approved surety company in the amount of five percent (5%) of the proposal submitted. Proposals shall remain firm for a period of forty-five (45) days after official opening bids. CONTRACT SECURITY: The successful Contractor will be required to furnish performance, labour bonds, each in the full amount of the proposal.
Post-Bid
Warehouse / Distribution - Pre-Engineered Storage Building
$200,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2024
June 20, 2024
130 Viking Dr, Dundee, MI
Related To This Project
Dundee, MI
Bid Date: Apr 11 2024
Dundee, MI
Bid Date: Jun 11 2024
Dundee, MI
Bid Date: Aug 05 2024
Dundee, MI
Bid Date: Aug 28 2024
Dundee, MI
--
Dundee, MI
Bid Date: Mar 18 2025
Dundee, MI
Bid Date: Mar 24 2025
Dundee, MI
Bid Date: Apr 23 2025
Dundee, MI
Bid Date: Apr 08 2024
Dundee, MI
Bid Date: Mar 15 2024
Dundee, MI
Bid Date: Mar 12 2024
Dundee, MI
Bid Date: Feb 27 2024
Dundee, MI
Bid Date: Jan 18 2024
Dundee, MI
Bid Date: Nov 13 2018
Dundee, MI
Bid Date: Nov 06 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
