Site work for a water / sewer project in Port Arthur, Texas. Completed plans call for site work for a water / sewer project.

GENERAL This contract provides for the coating of potable waterlines for the City of Port Arthur at two different locations. The project provides for the rehabilitation of two 36-inch steel waterlines aerial crossings at Savannah Avenue & Main Outfall Canal and at Savannah Avenue & Main D Canal/Alligator Bayou. The proposed rehabilitation includes blasting the pipes to bare metal and then recoating. This contract shall include all necessary labor, equipment, tools, materials, painting, disinfection, structural steel repairs, safety measures, environmental protection, shrouding, disposal of surplus items, site restoration, and all other related construction for the proposed water line installation and coating. The contractor shall coordinate with the City personnel when restoring the water lines to service. It shall be the bidder's responsibility to carefully inspect the site and all pertinent parts and appurtenances of the waterlines to ascertain the quantity of surface preparation, coating and replacement required to perform the proposed work and place the water line back into operation in accordance with the contract specifications. The Contractor shall use the materials specified, or materials of another manufacturer that are deemed equivalent in the opinion of the Engineer to the materials specified. In the event the Contractor desires to substitute the products of another manufacturer, he shall apply to the Engineer in writing at least fifteen (15) days prior to the bid date requesting substitution and shall furnish with the request complete descriptive materials on the product along with NSF Certification plus manufacturer's recommendations for surface preparation and application. WORK TO BE ACCOMPLISHED Contractor shall coordinate with City personnel prior to commencing work. All work is to be performed in strict accordance with the guidelines and procedures set forth within the Contract Specifications. This contract includes, but is not limited to, the following: 1. Savannah Avenue & Main Outfall Canal (36" Steel Waterline) 1. Contractor shall perform all surface preparation and coating of approximately 240 LF of 36-inch steel waterline exterior surfaces per specification Item 603 including, pressure washing the outside of the waterline, shrouding, removal and disposal of spent materials prior to commencing work. Contractor shall provide for quality control procedures for preparation of surfaces and coating application, all in strict accordance with the plans and specifications. 2. Contractor shall perform lead testing of exterior surfaces of the waterline. Contractor to provide lab testing result reports to Engineer for review, all in strict accordance with the plans and specifications. 3. Contractor shall perform lead abatement of hazardous material, if determined that the waterline contains lead as demonstrated by the lead testing results, all in strict accordance with the plans and specifications. 4. Contractor shall remove and replace the existing 3" x 1/4" Galv. Straps, all in strict accordance with the plans and specifications. 5. Contractor shall remove and replace the existing 2-inch air release valves, all in strict accordance with the plans and specifications. 6.Contractor shall restore the site to its original condition or better, including removal and disposal of all blasting media, construction debris, and by grading and replacing San Augustin sod, all in strict accordance with the plans and specifications. 2. Savannah Avenue & Alligator Bayou (36" Steel Waterline) 1. Contractor shall perform all surface preparation and coating of approximately 200 LF of 36-inch steel waterline exterior surfaces per specification Item 603 including, pressure washing the outside of the waterline, shrouding, removal and disposal of spent materials prior to commencing work. Contractor shall provide for quality control procedures for preparation of surfaces and coating application, all in strict accordance with the plans and specifications. 2. Contractor shall perform lead testing of exterior surfaces of the waterline. Contractor to provide lab testing result reports to Engineer for review, all in strict accordance with the plans and specifications. 3. Contractor shall perform lead abatement of hazardous material, if determined that the waterline contains lead as demonstrated by the lead testing results, all in strict accordance with the plans and specifications. 4. Contractor shall remove and replace the existing 3" x 1/4" Galv. Straps, all in strict accordance with the plans and specifications. 5. Contractor shall remove and replace the existing 2-inch air release valves, all in strict accordance with the plans and specifications. 6. Contractor shall restore the site to its original condition or better, including removal and disposal of all blasting media, construction debris, and by grading and replacing San Augustin sod, all in strict accordance with the plans and specifications. SPECIAL REQUIREMENTS 1. The Contractor shall contact Mrs. Jess Liao, P.E., Utility Engineer Manager at (409) 983-8193 prior to starting any work within the project site. 2. Contractor shall coordinate with the Owner and Engineer his schedule and sequence of construction. 3. Contractor to coordinate with property owners prior to entering property/easement. 4. The City will provide electrical service to the Contractor at no cost for this project. The Contractor will be required to apply for a construction water meter at the City of Port Arthur City Hall Customer Service office. 5. The Contractor shall restore the project site to its original condition or better prior to the project completion and acceptance by the Owner. The deadline to ask questions is 4/11/2024 5:00 PM CDT

Post-Bid

Water / Sewer

$430,000.00

Public - City

Site Work

5

7

7

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
12
Bidding Soon
498
All Active Projects
238
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2024

May 17, 2024

img_map_placeholder

Multiple Locations, Port Arthur, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.