BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Menifee, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

License Requirements Class-A and/or Class C-12 Liquidated Damages $2,000.00 for each consecutive calendar day Estimated Bid Value $921,500 Start/Delivery Date June 5, 2024 Project Duration This is a 30 working day contract. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting No Online Q&A Yes Q&A Deadline 04/04/2024 10:00 AM (PDT) Online Q&A Yes. Contact Info Jennifer Christoffersen 951-723-1731 jchristoffersen@cityofmenifee.us The work to be done is described in these Bid and Contract Documents for the above stated Project. The work will consist of: resurfacing the existing pavement by grinding and overlaying AC, removal and replacement of: 17 existing non-compliant accessible curb ramps, curb, gutter and cross gutters. The replacement of striping, and signage. This project is date specific, and the construction schedule shall be strictly adhered. The Contractor shall begin work on or before the date noted in the project construction time schedule shown below and in the General Provisions. Construction WORK HOURS will be limited between 8:00AM and 5:00PM Pacific Time, Monday to Friday unless approved by City Engineer. Each bid must be accompanied a certified or cashier's check payable to the City of Menifee, or a satisfactory bid bond executed by the bidder and an acceptable surety, in an amount equal to ten percent (10%) of the total aggregate bid amount. The successful bidder will be required to furnish and pay for performance and payment bonds acceptable to the Agency. Location #1 Local Roads AC Resurfacing Project (CIP No. 24-19) This project is located west of the 215 freeway and north of Ridgemoor Road. The major crossroads are Ridgemoor Road & Valley Blvd . This portion of the project is bounded by the following streets: Milky Way, Ridgemoor Rd., Dorado Dr., Orion CT., Pegasus Rd., Auriga CT

Award

Roads / Highways

$767,647.00

Public - City

Paving, Site Work

7

10

4

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
104
Bidding Soon
2,336
All Active Projects
1,051
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2024

June 5, 2024

img_map_placeholder

Multiple Locations, Menifee, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.