Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 17, 2024 at 8:00 PM
Updated May 18, 2024
Site work, paving and outdoor lighting for a mixed-use development in American Falls, Idaho. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; for paving for a transportation facility; and water / sewer project.
Reconstruct Runway 3-21 consists of reconstructing Runway 3-21, reconfiguring and reconstructing taxiway connectors, constructing a new turn around on the Runway 3 end, safety area grading, and stormwater improvements. Civil work includes full depth removal of existing asphalt by rotomill, excavation, construction of subbase, base, and asphalt surface course, removal of runway edge and end lighting, as well as shouldering, pavement marking, topsoiling and seeding, and other quantities. Approximate civil quantities include 33,730 SY of rotomill, 30,000 CY of excavation, 20,050 CY of total aggregates, 8,120 tons of hot mix asphalt pavement, and 7,150 SF of pavement marking. Electrical work includes installation of new vault building, equipment, new edge and threshold lights. Approximate electrical quantities include 12,000 LF of conduit, 14,850 LF of 5KV conductor, 12,300 LF of counterpoise, and 118 new MIRL fixtures. Work associated with proposed improvements is generally described as follows: SCHEDULE A: Reconstruct Runway 3-21 SCHEDULE B: Install Edge Drains SCHEDULE C: Install PAPI SCHEDULE D: Install REIL Reconstruct Runway 3-21 consists of reconstructing Runway 3-21, reconfiguring and reconstructing taxiway connectors, constructing a new turn around on the Runway 3 end, safety area grading, and stormwater improvements. Civil work includes full depth removal of existing asphalt by rotomill, excavation, construction of subbase, base, and asphalt surface course, removal of runway edge and end lighting, as well as shouldering, pavement marking, topsoiling and seeding, and other quantities. Approximate civil quantities include 33,730 SY of rotomill, 30,000 CY of excavation, 20,050 CY of total aggregates, 8,120 tons of hot mix asphalt pavement, and 7,150 SF of pavement marking. Electrical work includes installation of new vault building, equipment, new edge and threshold lights. Approximate electrical quantities include 12,000 LF of conduit, 14,850 LF of 5KV conductor, 12,300 LF of counterpoise, and 118 new MIRL fixtures. Install Edge Drains consists of installing new pavement underdrains along Runway 3-21 and taxiway connectors. Work includes installing edge drain and outlet pipe. Approximate quantities include 11,152 LF of underdrain pipe and 595 LF of outlet pipe. Install PAPI consists of installing a new Precision Approach Path Indicator (PAPI) for the Runway 22 end. The PAPI will be powered from a dedicated series circuit with a new constant current regulator installed in the electrical vault building. Work includes furnishing and installing all equipment, materials, and services necessary to place the system in operation for commissioning and flight check by the FAA. Install REIL consist of installing one set of new Runway End Identify Lights (REIL) on Runway 22.
Award
Transportation Terminals
$5,096,395.00
Public - County
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2024
June 24, 2024
2683 Airport Rd, American Falls, ID
Related To This Project
American Falls, ID
Bid Date: Jul 25 2024
American Falls, ID
Bid Date: Sep 12 2024
American Falls, ID
Bid Date: Dec 10 2024
American Falls, ID
Bid Date: Nov 26 2024
American Falls, ID
Bid Date: Mar 04 2025
American Falls, ID
--
American Falls, ID
Bid Date: May 15 2025
American Falls, ID
Bid Date: Oct 09 2025
American Falls, ID
Bid Date: May 01 2024
American Falls, ID
Bid Date: Mar 28 2024
American Falls, ID
Bid Date: Mar 28 2024
American Falls, ID
Bid Date: Oct 05 2023
American Falls, ID
Bid Date: Feb 08 2022
American Falls, ID
Bid Date: Feb 22 2022
American Falls, ID
Bid Date: Feb 22 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
