BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 17, 2024 at 8:00 PM

Updated May 18, 2024

Site work, paving and outdoor lighting for a mixed-use development in American Falls, Idaho. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; for paving for a transportation facility; and water / sewer project.

Reconstruct Runway 3-21 consists of reconstructing Runway 3-21, reconfiguring and reconstructing taxiway connectors, constructing a new turn around on the Runway 3 end, safety area grading, and stormwater improvements. Civil work includes full depth removal of existing asphalt by rotomill, excavation, construction of subbase, base, and asphalt surface course, removal of runway edge and end lighting, as well as shouldering, pavement marking, topsoiling and seeding, and other quantities. Approximate civil quantities include 33,730 SY of rotomill, 30,000 CY of excavation, 20,050 CY of total aggregates, 8,120 tons of hot mix asphalt pavement, and 7,150 SF of pavement marking. Electrical work includes installation of new vault building, equipment, new edge and threshold lights. Approximate electrical quantities include 12,000 LF of conduit, 14,850 LF of 5KV conductor, 12,300 LF of counterpoise, and 118 new MIRL fixtures. Work associated with proposed improvements is generally described as follows: SCHEDULE A: Reconstruct Runway 3-21 SCHEDULE B: Install Edge Drains SCHEDULE C: Install PAPI SCHEDULE D: Install REIL Reconstruct Runway 3-21 consists of reconstructing Runway 3-21, reconfiguring and reconstructing taxiway connectors, constructing a new turn around on the Runway 3 end, safety area grading, and stormwater improvements. Civil work includes full depth removal of existing asphalt by rotomill, excavation, construction of subbase, base, and asphalt surface course, removal of runway edge and end lighting, as well as shouldering, pavement marking, topsoiling and seeding, and other quantities. Approximate civil quantities include 33,730 SY of rotomill, 30,000 CY of excavation, 20,050 CY of total aggregates, 8,120 tons of hot mix asphalt pavement, and 7,150 SF of pavement marking. Electrical work includes installation of new vault building, equipment, new edge and threshold lights. Approximate electrical quantities include 12,000 LF of conduit, 14,850 LF of 5KV conductor, 12,300 LF of counterpoise, and 118 new MIRL fixtures. Install Edge Drains consists of installing new pavement underdrains along Runway 3-21 and taxiway connectors. Work includes installing edge drain and outlet pipe. Approximate quantities include 11,152 LF of underdrain pipe and 595 LF of outlet pipe. Install PAPI consists of installing a new Precision Approach Path Indicator (PAPI) for the Runway 22 end. The PAPI will be powered from a dedicated series circuit with a new constant current regulator installed in the electrical vault building. Work includes furnishing and installing all equipment, materials, and services necessary to place the system in operation for commissioning and flight check by the FAA. Install REIL consist of installing one set of new Runway End Identify Lights (REIL) on Runway 22.

Award

Transportation Terminals

$5,096,395.00

Public - County

Outdoor Lighting, Paving, Site Work

64

15

15

8

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
20
Bidding Soon
179
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

June 24, 2024

Project location map

2683 Airport Rd, American Falls, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.