BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a transportation facility in Houston, Texas. Completed plans call for the construction of a 120,000-square-foot transportation facility; and for site work for a transportation facility.

The deadline for requests for additional information and questions is April 10, 2024 @ 12:00 PM (Noon) CST. Please include the phrase RFI # H37-RFIMUFD-2024-017: QUESTIONS Questions Deadline: April 17, 2024, at 12:00 P.M. (Noon) Contact Person: Andre' Morrow, C.P.M., CPPB Sr. Procurement Specialist, Houston Airport System andre.morrow@houstontx.gov 281-233-1046 (o) 832-584-7130 (m) Project Summary: The Houston Airport System (HAS) is seeking industry information and input for innovative strategies and approaches from highly qualified firms that can be applied or included in the development of a subsequent Request for Qualifications (for Statement of Qualifications - RFQ) and Request for Proposals (RFP) that support attainment of the EFD/HSP goal to develop and construct an approximately 120,000 sf specified building with potential uses of light manufacturing/assembly for advanced products, high bay, and office space at Ellington Airport (EFD)/Houston Spaceport (HSP). EFD/HSP is open to, but not limited to, business models provided by a firm (or team) with competencies to Design, Build, Finance, Operate and Maintain (DBFOM). ABOUT THE PROJECT 3.1 The overarching objective of the Project is to enable EFD/HSP, its advisors, and the City of Houston to identify, procure, and implement continuous growth at HSP. 3.2 As the development of commercial spaceports continues to grow, HSP is seeking to be on the leading edge of commercial space with regards to top companies within the industry, academia, and national defense. The Project would consist of approximately 120,000SF of light industrial space for advanced products, testing, and office space designed for multitenant use. A portion of the space could include high bay space as needed. 3.3 Tenants occupying the space will be decided upon in conjunction with EFD/HSP based on aerospace/commercial space needs. 3.4 The parcel size is approximately 5.62 acres (245,800SF) and will need to include space for parking based on the City of Houston's required number of spaces of 2.5 parking spaces for every 1,000 square feet of gross floor area (GFA) which covers the multi-use projections for the Project.

Post-Bid

Transportation Terminals

$1,646,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
59
Bidding Soon
2,739
All Active Projects
1,055
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.