BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Monterey, California. Contact the soliciting agency for additional information.

Contact Information Sabine Gordon Administrative Services Technician 23 Ryan Ranch Road Monterey, CA 93940 Email: sgordon@monterey.org Phone: (831) 646-3860 In general, the work consists of, but is not limited to, all phases of tree management and maintenance, including planting, care, maintenance, pruning, and removal. This is a job order contract, which shall be used to provide the City with a readily available work force for tree maintenance services, and emergency response, as the City deems appropriate. In general, the work consists of all phases of tree management, care, maintenance, and miscellaneous associated work at such times and locations as required. The work shall include, but not be limited to: estimating the cost of, and performing, tree planting and transplanting, irrigation, pruning, and removal; emergency tree work after normal work hours, and/or at night, and/or on weekends and holidays; electrical conductor clearance, stump and root pruning, grinding and/or removal; hauling and/or disposing of brush, logs, and related debris; temporary traffic control design and implementation for tree work; arboricultural consultation, qualified tree risk assessment, tree health care diagnosis and treatment, report preparation, document review; tree inventory data capture utilizing the City's tree inventory. All work shall conform to industry standards as set forth in the American National Standards Institute (ANSI) A-300 Standards, Parts 1-9 and the ANSI Z-133.1 Safety Standards. The contract agreement will be for a term of one (1) year with a not-to-exceed annual funding limit of $1,000,000. The agreement will include an option for two additional one (1) year extension also with a not-to-exceed annual funding limit of $1,000,000. The total term of this agreement will not exceed three (3) years. The amount of work to be requested during the twelve-month contract period cannot be well defined at the outset. Work shall be issued through Job Orders. The City reserves the right to award up to four (4) contracts to a pool of the lowest responsive, responsible bidders in accordance with Section 28-9(b), Multiple Job Order Contracts Procedure, of the Monterey City Code. In addition, the ANSI Standards and Best Management Practices shall be followed as guidelines during all phases of tree work including, but not limited to: Safety, planting, pruning, fertilization, transplanting, installation of support systems, installation of lightning protection systems, construction impact management inspection and implementation, integrated vegetation management, tree risk assessment, tree removal, and stump grinding. An original certified check or cashier's check payable to the order of the City of Monterey, or a satisfactory bid bond executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the bid amount shall be uploaded with each bid, as a guarantee that the bidder, if its bid is accepted, will promptly execute the Agreement. The bid bond must be notarized, include the embossed surety seal, and include a Power of Attorney if the signee is not an officer of the surety.

Post-Bid

Municipal

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
27
Bidding Soon
707
All Active Projects
293
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

May 16, 2024

img_map_placeholder

Multiple Locations, Monterey, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.