BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a detention facility in Milwaukee, Wisconsin. Completed plans call for the construction of a 63,300-square-foot, one-story above grade detention facility; and for site work for a detention facility.

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of: a new, Type 1 security level, juvenile corrections facility at 7930 W Clinton Avenue, Milwaukee, Wisconsin. The facility will provide housing, food service, health services, education, counseling, vocational training, visitation, recreation, administrative services, and other supporting spaces for a population of 32 juveniles. The building will be 1 story with a partial mechanical penthouse. Exterior walls will be primarily brick with concrete block back up with some phenolic resin accent panels. Additional regional materials, native plantings and bird-safe glazing will be provided. Sustainable features include solar photo voltaic panels on the penthouse roof, LED lighting within the building, dark sky approved lighting around the site, and EV charging stations. Exterior improvements include parking and loading areas, recreation space, security wall band additional fencing. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Bid Result PLUMBING WORK CornerStone One, LLC 1,980,000 MECHANICAL WORK J & H Heating, Inc. 4,633,000. ELECTRICAL WORK Altmeyer Electric, Inc. 7,785,375.

Bid Results

Jails / Prisons

$173,000.00

Public - State/Provincial

New Construction, Site Work

326

46

178

7

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
46
Bidding Soon
977
All Active Projects
442
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2024

July 15, 2024

img_map_placeholder

7930 W Clinton Ave, Milwaukee, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.