BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Granville Township, Pennsylvania. Completed plans call for site work for a water / sewer project.

The County reserves the right to increase and decrease quantities, as necessary. The Mifflin County Commissioners reserve the right to reject any and all proposals and waive any formality or technicality in any proposal in the interest of the County. A certified check or bank draft, payable to County of Mifflin or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to ten (10%) of the total Base Bid shall be submitted with each bid as a guaranty that if the Proposal is accepted, the Bidder will execute the Contract and file acceptable Performance, Maintenance, and Labor and Material Bonds within ten (10) days after award of the Contract. Document notes: The EADS Group, Inc. for the nonrefundable fee of $100.00 for one hard copy set or for the nonrefundable fee of $25.00 for the electronic format set of contract documents and plans, both of which includes 6% Pennsylvania sales tax. To access the electronic format the bidder must have a valid email address and will require an internet connection. All checks shall be made payable to The EADS Group, Inc. Bidders must purchase the Contract Documents and Plans (in either format) from The EADS Group, Inc. to be eligible to bid this project.

Bid Results

Water / Sewer

$980,471.00

Public - County

Site Work

32

19

2

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
34
Bidding Soon
609
All Active Projects
260
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

May 23, 2024

img_map_placeholder

PA-333, Granville Township, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.