Published October 22, 2024 at 8:00 PM

Updated October 23, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Broughton Township, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Replace existng structure with a three-span RC slab bridge with HMA approach, aggregate and HMA shoulders, and guardrail improvements on CH 3 over Broughton Creek, one mile north of Campus. Region 2 District 3 Federal Project YV6Z(343) County(S) Livingston Key Route(S) FAS 343 Section(S) 20-00199-04-BR State Job # C-93-007-24 PPS #(S) 3-10697-0000 Contract Specifics 50 Working Days Questions not accepted as of April 16, 2024 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 05, 2024. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 164 - Replace Existng Structure With Three-span RC Slab Bridge 21.0318.130 This work shall consist of the removal of the existing structure and construction of a three-span reinforced concrete slab superstructure with steel railing supported on concrete integral abutments and individually encased pile bent piers, 89'-0" back-to-back of abutments and 32'-0" out to out of deck with no skew. Also included are channel excavation and protection, seeding, reconstruction of 360' of County Highway 3 with a hot-mix asphalt surface, aggregate and HMA shoulders, guardrail improvements, and other related work. The road will be closed to traffic during construction. The contractor shall submit fabrication plans to Hampton, Lenzini and Renwick, Inc., Consulting Engineers, 3085 Stevenson Drive, Suite 201, Springfield, Illinois 62703, for review and approval. Files can be sent electronically to swmegginson@hlreng.com

Award

Bridges / Tunnels

$737,652.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

23

6

7

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, Mobile Earth Moving Equipment, Excavators

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
96
Bidding Soon
1,743
All Active Projects
683
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2024

June 25, 2024

img_map_placeholder

Co Hwy 3, Broughton Township, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.