BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Aurora, South Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Aurora Sanitary Sewer Improvements - Phase 2 Project Category Code: Sanitary Sewer (Gravity), Water Utilities, Pavement - Marking, Trenchless Utility Construction, Culverts, Waterways, Stormwater Channels, Aggregate, Concrete Pavement, Street/Road Asphalt Milling, Bored Conduit, Traffic Control, Fencing/Guardrails/Handrails, Fire Hydrant, Pavement Removal, Asphalt Pulverizing, Excavation, Street/Road Materials, Erosion Control - Temporary, Roadway Pavement Markings, Directional Bore, Street/Roadway Reconstruction , Street/Road Pavement Marking, Railroad, Concrete Repair , Sewer and Water Construction, Sitework/Excavating and Grading, Water and Wastewater Facilities, Water/Wastewater Infrastructure, Concrete Pavement Removal, Street/Road Concrete Reconstruction, Paving (Highway, Road or Street) Description: Furnish and Install approximately 1400 LF of 18" diameter gravity sanitary sewer; Furnish and Install approximately 2700 LF of 15" diameter gravity sanitary sewer Furnish and Install approximately 800 LF of 10" diameter gravity sanitary sewer; Furnish and Install approximately 250 LF of 8" diameter gravity sanitary sewer; Furnish and Install approximately 650 LF of 4" diameter sanitary sewer service pipe & 20 service wyes; Furnish and Install approximately 20 EA - 48" Dia. Sanitary Sewer Manholes Furnish and Install approximately 440 LF of Bore and Jack 24" Steel Casing Pipe; Furnish and Install approximately 220 LF of 8" diameter water main; Furnish and Install sanitary sewer and watermain tracer wire systems; Approximately 3600 SY of full depth roadway reclamation; Furnish and Install approximately 7200 Tons of base course; Furnish and Install approximately 9400 SY of asphalt concrete; Furnish and Install approximately 680 SY of 8" PCC pavement; Furnish and Install Traffic Control Signage includes detour signage; Surface restoration and all other miscellaneous work required not herein mentioned, but inferred from the construction Contract Documents. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. Bid Alternate No. 1 Furnish and Install approximately 500 LF of 8" diameter and 200 LF of 6" diameter watermain pipe and associated appurtenances The Bidder to whom the contract is awarded will be required to furnish a construction performance bond and a construction payment bond to the Owner in the amount of one hundred percent (100%) of the contract award for each bond, in conformance with the requirements of the Contract Documents. The construction performance bond and construction payment bond shall remain in full force until the completion of the Contract as specified in the General Conditions. All bids must be accompanied by a Bid security. Bid security will take the form of a bid bond in an amount of ten percent (10%) of the Bidder's maximum Bid price or a cashier's or certified check made payable to Owner in an amount of five percent (5%) of the Bidder's maximum Bid price. The Bid security will be retained by the Owner if the successful bidder refuses or fails to enter into an Agreement within fifteen (15) days after Notice of Award or fails at time of executing the contract to furnish a construction performance bond and construction payment bond guaranteeing the faithful performance of the work. Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138 (WBE). The MBE goal for this project is 1% of the total dollar value of the job while the WBE goal is 4% of the total dollar value of the job. Davis-Bacon and related acts provisions apply to this project. All provisions relative to those acts must be met. Est. Value Notes: $3 million to $4 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$4,000,000.00

Public - City

Paving, Site Work

158

14

6

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
11
Bidding Soon
161
All Active Projects
68
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

June 3, 2024

img_map_placeholder

Multiple Locations, Aurora, SD


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.