Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a mixed-use development in Gilbert, Arizona. Conceptual plans call for the renovation of a municipal facility; and for site work for a playground / park / athletic field.
GILBERT reserves the right to waive any irregularities in any submittal and to reject all submittals and re-advertise or cancel the project in its entirety, at its sole discretion. GILBERT, or its consultants and advisors, will not be responsible for any cost incurred by any firm submitting a SOQ or responding to this notice. A general description of the Project is: Due to the worsening conditions on the Colorado River caused by historic drought, climate change, and over allocation, the Town of Gilbert has activated the first stage of its Water Supply Reduction Management Plan. The first stage of Gilbert's Water Supply Reduction Management Plan includes; heightened efforts by the Town to decrease municipal water usage; a call on residents and businesses to voluntarily conserve water, especially outdoors; increased community outreach and education. Gilbert Parks and Recreation has been exploring areas of turf that would be good candidates for a turf conversion to xeriscape. In selecting areas, the department considered the following considerations; historical water usage, potable water source vs. reclaimed water source, whether the turf area is passive or active in use by the community, and the health of the grass area and the surrounding trees. The town received a grant from the Water Conservation Grant Fund that will have a Grantee Matching of at least 25% match. The Town identified the following locations for Turf Removal: Muni 2 Cactus Yards Public Safety Building Riparian Traffic Operation Center Freestone Park Cosmo Park Muni 1 Public Works Building Circle G Park Crossroads Park Cactus Yards The work currently contemplated by this RFQ covers all locations. The Town reserves the right to modify/expand the scope of this project to include/exclude any or all the above-named locations, depending on priorities, timing and funding availability. The actual scope of the A/E services will be defined during the contract negotiations.
Conceptual
Municipal
$292,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 11, 2025
To Be Determined, Gilbert, AZ
Related To This Project
Gilbert, AZ
--
Gilbert, AZ
Bid Date: Apr 15 2024
Gilbert, AZ
Bid Date: Mar 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.