BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated October 2, 2025

Site work and paving for a mixed-use development in Bolivar, Missouri. Design plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and bridge / tunnel.

As of May 2, 2025, per owner, construction is likely to begin early 2026. RFQ was completed last year and an engineer service selected. No contractor has been selected yet and they expect to put a bid for construction notice in the early fall of 2025. Federal Aid No: TAP-6701808 City/County: Bolivar, MO DBE Goal Determination: 5 % Location: Bolivar, MO Length: 1.15 miles The project may include open drainage ways, enclosed (box) culverts, multiuse paths, regional detention basin and other infrastructure. Name: Kyle Lee Address: 345 S Main St. Bolivar, MO 65613 Phone: 417-328-5825 Email: Klee@bolivar.mo.us MODOT - RFQ Engineering - Route: S Springfield Ave (between E Aldrich Rd and 2230 S Springfield Ave)

Design

Water / Sewer

$628,200.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
63
Bidding Soon
516
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

Project location map

S Springfield Ave, Bolivar, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.