BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Crystal Lake, Illinois. Contact the soliciting agency for additional information.

Last day for vendors questions via email ddammon@mchenry.edu April 4, 2024 Response to vendor questions will be listed by addendum April 5, 2024 Reviewed by MCC Evaluation Team by April 11-22, 2024 Recommendation to Board of Trustees April 25, 2024 Notification of Award by April 26, 2024 McHenry County College is inviting responsible Contractors to submit proposal for the purchase of 3 Downdraft Grinding Stations for Metal Working. Each piece of equipment must come with the necessary accessories to begin operation in an educational setting. The successful bidder will supply all materials and perform all labor necessary to complete the project based on the specifications listed below. All pricing shall be listed and submitted on the form below. If using other or additional forms other than the one listed below, please itemize and price all items. The College is exempt from all sales tax. Also include pricing for any training, installation, setup, delivery, shipping and handling, warranty, repair service, etc. The proposal should be in effect for 60-90 days. Pricing should reflect the purchase for each machine in quantities of 1, 2 and 3. Please include any discount for volume purchasing. Downdraft Grinding Stations for Metal Working or equivalent. Includes standard equipment of the following: (place a checkmark in the column to the left of each item that meets requirements) Must also include these accessories: The unit needs to have a 28" x 72" grinding area The tabletop plates must be 1/4 " minimum thickness Filtration needs to be at 0.5 microns with a 99.95% capture rate Filters must be fire resistant and the unit must have a pneumatic pulse jet cleaning system for the filters that can be set by a timer as well as operated by a push button The unit must also have a water pan over the filters to increase filter life and reduce the spark exposure to the filters Air flow needs to be a minimum of 3600 CFM The table needs to utilize a single 230-volt single phase motor with a minimum of 3 horsepower Maximum decibels need to be 76 or less The table must be on casters

Post-Bid

Educational

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
102
Bidding Soon
2,136
All Active Projects
918
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2024

May 13, 2024

img_map_placeholder

8900 US-14, Crystal Lake, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.