BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Lawrence, Massachusetts. Completed plans call for the renovation of a educational facility.

Fire Pump Replacement at Arlington School. Work includes all labor, materials, equipment, transportation and supervision necessary for the Fire Pump Replacement at the Arlington School Complex. Required DCAMM Certification as Prime/General Contractor in Fire Protection. Estimated Cost $192,938.00 Bidders must submit a 5% bid deposit with their bid. All bids submitted in response to the Invitation for Bids will be evaluated and awarded in accordance with the provisions established under M.G.L. c. 149, 44A-J. Vendors will be required to abide by the guidelines established under this statute. This project is subject to Prevailing Wage Rates, DCAMM Certification and OSHA Certifications. The City of Lawrence reserves the right to reject any or all bids or take whatever action is in the best interest of the City. SCOPE OF WORK A. The project includes all equipment, piping, control, devices and apparatus associated with the installation of a single, electric, fire pump, jockey pump and its controllers in the same locations as existing. B. The work under this Section shall include the furnishing of all materials, labor, equipment and supplies and the performance of all operations to provide complete working systems, in general, to include the following items: 1. Pipe, Fittings, and Valves 2. Fire pump, jockey pump and controllers 3. Check valves and ball drip 4. Provide all valves, drains, gauges, plus related accessories required for a complete installation of each system specified and indicated 5. Supervisory (tamper) switches 6. Water flow switches, Low pressure switch 7. Isolation valves 8. Pressure gauges 9. Hangers, supports, pipe sleeves, pump supports, inserts and anchors 10. Seismic restraints, expansion joints, vibration control 11. Supplementary steel for piping and equipment supports 12. Valve tags, charts and pipe identification 13. Fire Pump coordination drawings 14. Record drawings 15. Testing of systems in accordance with NFPA 16. Operating and maintenance manuals 17. Guarantee 18. Inspectorís test ports

Bid Results

Educational

$262,900.00

Public - City

Renovation

8

15

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
147
Bidding Soon
2,695
All Active Projects
1,117
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

May 27, 2024

img_map_placeholder

150 Arlington St, Lawrence, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.