BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Georgetown, Texas. Completed plans call for site work for a water / sewer project.

The project includes the full renovation of the District's Cat Hollow Lift Station and gravity sewer improvements to support the decommissioning of the Hillside Lift Station. Cathollow Liftstation 16920 Smyers Lane Round Rock, Tx 78681, Hillside Lift Station 1208 Sutter Creek Trail Austin, Tx78681 and 4014, 4100, 4102 Hill Side Drive Round Rock ,TX 78681 Question Deadline 05/01/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents through online to allow all bidders access to the questions and answers. interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders via online. Questions received less than seven days prior to the date for opening of Bids may not be answered Project includes, but is not limited to, the following Work: Work of the Project includes construction on the Cat Hollow Lift Station. The project involves: 1. Construction of a new wet well 2. Installation of submersible pumps, piping, motors, valves, guide rails, and other appurtenances. 3. Demolition of the existing dry well and/or wet well, including removal and/or salvage of pumps, piping, electrical, and other components. 4. Site improvements involving a crushed limestone gravel cover and fencing along the perimeter. 5. Construction of a new foundation pad for a generator. 6. Installation of an emergency diesel generator. 7. Installation of a new jib crane, including a foundation pad. 8. Installation a new activated carbon-based passive drum scrubber and construction of a foundation pad. 9. Integration of recently upgraded electrical and I&C systems into the new design. 10. Installation of a new canopy to protect aboveground electrical and I&C controls. Work of the Project includes the decommissioning of the Hillside Lift Station. The project involves: 1. Demolition and/or salvage of all pumps, motors, couplings, valves, and controls associated with the existing lift station. 2. Demolition of existing wet well and valve vault. 3. Abandonment of the existing force main and gravity piping. 4. Construction of a new gravity sewer main connected to the nearby FBMUD gravity system. 5. Traffic control for the area in project right of way (ROW). Perform Work according to Conditions of Contract. The Brushy Creek Municipal Utility District, Williamson County, Texas, reserves the right to reject any or all bids, or to waive any informalities, or to make an award to other than the low bidder. It further reserves the right to limit the amount of the award and eliminate a portion of the work or add additional work as required to keep the total contract amount with the funds budgeted; to award any part or combination of parts of the project it deems necessary; and any other rights established under the laws of the Stat of Texas. The Brushy Creek Municipal Utility District does not discriminate on the basis of handicapped status in admission or access to, or treatment or employment in, its programs and activities. Bid security shall be furnished in accordance with the Instructions to Bidders.

Award

Water / Sewer

$3,548,000.00

Public - County

Site Work

235

34

9

10

Subscribe For Documents

85 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
31
Bidding Soon
1,883
All Active Projects
714
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.