BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a swimming pool in Quebec, Quebec. Completed plans call for site work for a swimming pool.

Reference number : 1826669 Deadline for receiving complaints: 2024-04-09 Electronically transmitted submission accepted: Yes, via the SEAO, with a document The work covered by this contract is located at 95, rue de la Serenite in the District of Beauport, and includes, but is not limited to: B0180 -Heron sanitary block . Replacement of the propane water heater with an electric one; . Demolition of propane piping; . Replacement of the main electrical panel and connection of the new water heater. B0421 - Renard sanitary block . Replacement of propane water heater with an electric one; . Demolition of propane piping; . Replacement of the main electrical panel and connection of the new water heater; . Replacement of the 600V line supplying the sanitary block; . Trenching and recovery of surfaces for the new artery; . Replacement of the electrical panel supplying the sanitary block. B0185 - Swimming pool mechanical room . Demolition of the propane pool heater, as well as all the piping for heating the pool and paddling pool; . Demolition of propane piping; . Installation and connection of new equipment for heating the swimming pool (heat pumps and pump), as well as the associated piping; . Construction of a concrete base with a mesh enclosure for the heat pumps; . Refinishing the exterior covering; . Demolition of electrical distribution; . Construction of a new electrical distribution and connection of new mechanical equipment; . Electrical modification in the building supplying the swimming pool mechanical room. B0524 - Swimming pool sanitary block . Replacement of the propane water heater with an electric one; . Demolition of propane piping; . Replacement and relocation of the building's main electrical panel; . New 600V artery for powering the new water heater; . Trenching and recovery of surfaces for the new artery. The three toilet blocks will be occupied from the end of June to the beginning of September 2024. The contractor will not be able to carry out work in them during this period. The swimming pool mechanical room will be in operation from the beginning of June to the beginning of September. Work may be carried out partially during this period inside and outside the building, but demolition and final connections cannot be carried out during this period. During work, the City will provide keys. If the contractor loses a key, he will have to pay an amount of $500 per key. The City will have a form signed to this effect when the keys are given to the contractor. The City will also provide a code to disarm the intrusion alarm system. *Award is subject to final approval.

Award

Swimming Pools

$222,522.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
39
Bidding Soon
930
All Active Projects
345
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 30, 2024

September 9, 2024

img_map_placeholder

95 Rue de la Sérénité, Quebec, QC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.