BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 23, 2024 at 8:00 PM

Updated May 20, 2026

Site work and new construction of an educational facility in Henderson, Nevada. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

https://www.reviewjournal.com/local/education/this-is-huge-new-early-childhood-education-center-coming-to-henderson-3144729/ The Henderson City Council approved over $15 million in funding Tuesday to build a new preschool. In a unanimous vote, the council approved $15,387,528 to fund construction for a new early childhood education center. The preschool will house seven to nine classrooms for about 180 children, according to a news release, and will be built in Cadence, a master-planned community in east Henderson. It will serve students from east Henderson and downtown Henderson. The location for the preschool will be on a lot on the southeast corner of Black Palace Street and Scarhill Track Avenue, which is near Galleria Drive and Grand Cadence Drive, according to city spokesperson Justin Emerson. The timeline is still rough, but the city is looking to open the facility in the summer of 2027, said Tara Phebus, the city's division head for education initiatives. Henderson, as well as other areas in Nevada, faces a shortage of early childhood education centers, Phebus said. "If every 3- to 4-year-old wanted to go into a program tomorrow, we don't have enough physical infrastructure to be able to put those kids in programs," said Phebus. "For all the preschool-aged children that we have in Henderson, less than half of them are enrolled in programs, and we know how critical it is for being prepared for starting kindergarten," Phebus continued. The preschool will offer scholarships to students who live in the downtown and eastside areas in an effort to make the preschool more affordable compared to other programs, Phebus said. In an earlier redevelopment meeting, Councilwoman Carrie Cox said, "I taught during COVID and post-COVID, and it was very difficult as a kindergarten teacher to watch them struggle. This is huge for the city of Henderson." _______________________________________________________________________________________________________________________________________________________________ The City of Henderson, Nevada, is soliciting responses from qualified construction managers/general contractors ("Proposer") for the performance of Construction Manager at Risk ("CMAR") services for the construction of a preschool of approximately 30,000 square feet and eight (8) classrooms. The building will be located in the Cadence area at the SE corner of Scarhill Track Avenue and Black Palace Street, Henderson, Nevada 89011. Question Deadline 04/16/2024 at 12:00 PM PT All questions regarding this RFP must be submitted electronically The Citys construction estimate is $15,000,000.00 Pre-construction services shall include active participation in the design process including constructability reviews; construction cost estimates at 90% and 100%; system and unit price costing for subcategories of work; advice; project analysis and feedback regarding materials, methods, systems. Services also include schedule development, descriptions of long lead time items, analysis and expertise relating to labor and other conditions affecting construction and subcontractor selection for development and construction of the Project. CMAR to assist in all ways possible to achieve the project goals. At the completion of design, the CMAR shall follow Nevada Revised Statute (NRS) requirements for delivering a Guaranteed Maximum Price. The City's construction estimate is $15,000,000.00, therefore Nevada State Prevailing Wage Rates will apply.

Post-Bid

Educational

$15,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
37
Bidding Soon
559
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

August 23, 2024

Project location map

Scarhill Trak Ave & Black Palace St, Henderson, NV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.