Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to a mixed-use development in Costa Mesa, California. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and water / sewer project.
Bid Valid 5/2024 Liquidated Damages $2,500.00/Day Estimated Bid Value $9,200,000.00 Start/Delivery Date 5/2024 Project Duration 95 Calendar Days License Requirements A or B Q&A Deadline 04/16/2024 4:00 PM (PDT) Newport-Mesa School District is adding portable classrooms, portable restrooms and modifying the TK/Kindergarten outdoor play area at five elementary school campuses: California, Eastbluff, Killybrooke, Victoria and Newport Heights. The general scope at each site shall include the purchase and installation of playground equipment and two shade structures at each site. The new and refurbished portable buildings will be owner purchased and installed on raised foundations with ramps, contractor will be responsible for preparing site for building placement. This scope will require the contractor to extend existing utilities, including water, sewer, electrical / low voltage, and fire alarm and making final utility connections of the portable buildings shown at each campus. The overall project will also include DSA required accessibility and fire life safety upgrades to the five elementary school campuses as shown in the drawings. Project will be constructed under a single prime contract. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% California Elementary - This site will include site preparation and utility connection for two (2) new portable buildings on existing asphalt. Procurement and installation of play equipment and shade structure in existing play area including expansion and replacement of poured in place rubber surfacing and an independent shade structure covering. Procurement and installation of an additional shade structure over existing asphalt with repair of surface required for access compliance. Restroom upgrades/reconfiguration required at multiple restrooms for access compliance. Site improvements include reconfiguration of drop-off, accessible parking and site fencing to accommodate accessibility requirements along with misc. path of travel improvements and a new on-site fire hydrant required for fire and life safety (connected to on-site fire water line). - Eastbluff Elementary - This site will include site preparation and utility connection for five (5) new portable buildings and one (1) portable restroom building on new asphalt. Procurement and installation of play equipment and shade structure within existing play area including replacement of poured in place rubber surfacing and an independent shade structure covering. Procurement and installation of an additional shade structure over existing asphalt with repair of surface required for access compliance. Restroom upgrades/reconfiguration required at multiple restrooms for access compliance. Site improvements include new accessible drop-off, accessible parking updates and site fencing reconfiguration to accommodate scope requirements and building placement. - Killybrooke Elementary - This site will include site preparation and utility connection for four (4) new portable buildings and one (1) portable restroom building on new asphalt. Procurement and installation of play equipment in new play area including new curbs and placement of poured in place rubber surfacing and an independent shade structure covering. Procurement and installation of an additional shade structure over new asphalt. Minor restroom upgrades required at multiple restrooms for access compliance. Site improvements include reconfiguration of dropoff, accessible parking and site fencing to accommodate scope requirements. Extension of the existing fire lane and a new on-site fire hydrant (connected to onsite fire water line) will also be required for fire and life safety. - Newport Heights Elementary - This site will include site preparation and utility connection for three (3) new portable buildings and one (1) portable restroom building on new asphalt. Procurement and installation of play equipment and shade structure in existing play area including expansion and replacement of poured in place rubber surfacing and an independent shade structure covering. Procurement and installation of an additional shade structure over existing asphalt with repair of surface required for access compliance. Minor restroom upgrades required at multiple restrooms for access compliance. Site improvements include reconfiguration of site fencing to accommodate scope requirements. - Victoria Elementary - This site will include site preparation and utility connection for four (4) refurbished portable buildings on new asphalt. Procurement and installation of play equipment in new play area including new curbs and placement of poured in place rubber surfacing and an independent shade structure covering. Procurement and installation of an additional shade structure over existing asphalt with repair of surface required for access compliance. Restroom upgrades/reconfiguration required at multiple restrooms for access compliance. Site improvements include reconfiguration of drop-off, accessible parking and site fencing to accommodate scope requirements. Extension of the existing fire lane and a new on-site fire hydrant (connected to city main) will also be required for fire and life safety Project Locations: a. California ES: 3232 California Street, Costa Mesa, CA 92626 b. Killybrooke ES: 3155 Killybrooke Lane, Costa Mesa, CA 92626 c. Victoria ES: 1025 Victoria Street, Costa Mesa, CA 92627 d. Newport Heights ES: 300 E. 15th Street, Newport Beach, CA 92663 e. Eastbluff ES: 2627 Vista del Oro, Newport Beach, CA 92660
Award
Educational
$9,197,000.00
Public - City
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2024
May 1, 2024
Multiple Locations, Costa Mesa, CA
Related To This Project
Costa Mesa, CA
Bid Date: Apr 30 2024
Costa Mesa, CA
Bid Date: May 06 2024
Costa Mesa, CA
Bid Date: Apr 26 2024
Costa Mesa, CA
Bid Date: Apr 29 2024
Costa Mesa, CA
Bid Date: May 13 2024
Costa Mesa, CA
Bid Date: May 23 2024
Costa Mesa, CA
Bid Date: May 23 2024
Costa Mesa, CA
Bid Date: May 15 2024
Costa Mesa, CA
Bid Date: Apr 04 2024
Costa Mesa, CA
Bid Date: Apr 18 2024
Costa Mesa, CA
Bid Date: Jun 06 2024
Costa Mesa, CA
Bid Date: Apr 25 2024
Costa Mesa, CA
Bid Date: Apr 16 2024
Costa Mesa, CA
Bid Date: Mar 20 2024
Costa Mesa, CA
Bid Date: Oct 29 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.