Renovation of a water / sewer project in Hayward, California. Completed plans call for the renovation of a water / sewer project.

**As of May 23, 2024, the project was awarded to Elecco LLC in the amount of $997,246.07.** Board of Supervisors for the Alameda County Flood Control and Water Conservation District approved the following project for advertisement and invites all qualified contractors to submit bid proposals for all labor, material, equipment, mechanical workmanship, transportation, and services required for die work to be performed. The work to be done at J-2 Pump Station consists, in general, ofinstalling the Districtfurnished Remote Monitoring Unit and respective conduits, cables and testing of systems, including required SCADA communications and interface with die remote District Control center (951 Turner Court): providing complete, continuous, operational, and functioning systems: furnishing all labor, materials, tools, equipment, mechanical workmanship, transportation, and all miscellaneous work necessary to complete said project. The work to be done at J-3 Pump Station consists, in general, ofproviding and implementing job site management: removing and disposing of underground fuel tank and all associated above and below ground appurtenances; furnishing, placing and compacting asphalt concrete, aggregate base and structure backfill; furnishing and installing transformer concrete pad per PG&E standard: furnishing and installing transformer barrier wall; furnishing and installing bollards; saw cutting, removing, and disposing CMU wall; removing and replacing exhaust air louver; removing and disposing existing genset and all associated appurtenances; furnishing and installing a new 250 KW generator set with a 660-galIon belly tank and all associated above and below ground appurtenances; furnishing and installing a remote fuel oil system; furnishing and installing structural supports for electrical and mechanical equipment and associated pipes; coordination with PG&E for installing new outdoor Utility Metering Cabinet and replacing main breaker sections of existing automatic transfer switch with bypass isolation features, motor control center, dry-type transformer, and distribution panelboards; installing District-furnished Remote Monitoring Unit (RMU); modification and installation of various sizes of 600V power, control, and lighting cables, conduits, raceways, both exposed, and underground, and grounding systems associated with the equipment replacement work; designing, submitting, furnishing, programming and verification testing of station operational controls including standby generator, automatic transfer switch, backup control panel, RMUs, and SCADA communications and interface with the remote District control center (951 Turner Court); furnishing and replacing of all existing interior lighting fixtures with new LED fixtures and respective conduits, cables, and switches, receptacles and associated appurtenances; providing complete, continuous, operational, and functioning systems; furnishing all labor, materials, tools, equipment, mechanical workmanship, transportation, and all miscellaneous work necessary to complete said project. This project is subject to all Local, State, and Federal laws, rules and guidelines contained in the plans and specifications, including but not limited to payment of prevailing wages. These wage rates are available at the Alameda County Public Works Agency's office at 951 Turner Court, Room 300, Hayward, Alameda County. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5, with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a). The contractor for this project must possess a Class A or Class C-10 license at the time this contract is awarded and throughout the construction contract duration. Contractor must also be properly licensed at the time the bid is submitted, except as provided for in Section 7029.1 of the Business and Profession Code for joint ventures or by Section 20103.5 of the Public Contract Code for federally-funded projects. The Alameda County Flood Control and IFater Conservation District (District) strongly encourages the participation of disadvanlaged/minority/women-owned business enterprises in all District capital improvement construction projects. The District also strongly encourages the hiring ofapprentices who reside within the County of Alameda. For more information about the Alameda County Contractor Technical Assistance Program (CTAP), please contact Johanna Le-Penn, Business Development Manager, at (415) 217-6567 or via email atjohanna@imwis.com or CTAP@imwis.com. Bidders shall submit both hard copies and digital PDF copies (on thumb drive) of valid Certificates of Reported Compliance to 951 Turner Court. Room 300, Hayward. CA. All questions should be directed to the Contract Administration Office at (510) 670-5450. The Board of Supervisors reserves the right to reject any or all bids and any or all items of such bids. The objective of this Work Plan is to specify methods to assess the presence of a potential release from a 500-gallon diesel underground storage tank (UST) planned for removal at the Site. To perform the assessment, Ninyo & Moore proposes to advance two (2) borings adjacent to the UST and collect soil and groundwater samples for laboratory analysis. Additional details of the proposed scope of work are discussed in the following Sections of this Work Plan. The work shall consist of saw cutting, excavation, backfilling, compacting, asphalt paving, trench protection, disconnecting, demolishing, removing, and disposing of the existing underground storage tank, pipes, vent pipes, conduits, concrete, and associated appurtenances underneath and above ground as indicated to be removed on the plans. Any excavated soil shall be sampled and profiled for possible re-use and/or disposal. Soil testing and sampling under the underground storage tank after it has been removed shall be required, in addition to a groundwater sample if encountered. Obtain the necessary permits from the City of Union City Environmental Department and the Alameda County Water District, and comply with the requirements outlined in the pennits. Attention is directed to Section 14.11, “PERMIT REQUIREMENTS”. Contractor is responsible for all permits, fees, and notifications. Trenches, holes, depressions and pits caused by the removal of underground storage tank and associated appurtenances shall be backfilled structure backfill materials as provided in Section 14.15, "EARTHWORK" of these special provisions and restore the site. Asphalt concrete and asphalt resurfacing shall conform to Section 14.16, “Asphalt Concrete.”The underground fuel storage tank, pipes, conduits, and all associated excavated materials removed shall become the property of the Contractor and shall be disposed of as provided in Section 14.14, “DISPOSAL OF MATERIALS” of these special provisions. Viewing of the project site is not mandatory; however prospective bidders are encouraged to attend to familiarize themselves with the existing site conditions

Award

Water / Sewer

$997,246.00

Public - County

Renovation

33

7

2

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
94
Bidding Soon
1,867
All Active Projects
698
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

May 23, 2024

img_map_placeholder

Multiple Locations, Hayward, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.