Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and outdoor lighting for a road / highway in West Allis, Wisconsin. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.
**As of May 31, 2024, This project has been awarded to Pro Electric, Inc, with the awarded amount of $1,667,254.17.** The work under this Contract consists of street lighting circuit conversion of the Q-2 Circuit, Q-3 Circuit and V-3 Circuit from high voltage series to low voltage parallel with LED; with removals of existing concrete bases, salvaging of poles and arms, replacement of damaged items, installation of new LED luminaires, low voltage infrastructure and all incidental items necessary to complete the work as shown on the Plans and included in these Special Provisions. Pre-Qualification: Yes Lighting Circuit Q-2: S. 104th St. to S. 100th St. & W. Schlinger Ave. to Union Pacific Railroad Lighting Circuit Q-3: Union Pacific Railroad to S. 104th St. & North City Limits to W. Greenfield Ave. Lighting Circuit V-3: West City Limits to S. 117th St. & W. Lincoln Ave. to Cleveland Ave. and consisting of the following approximate quantities: 1. Restoration in Soil ........................................................................................... 5,558 sq. ft. 2. Mobilization, Traffic Control, Signage, Access, Staking (Per Circuit).................... 3 each 3. Removing Concrete Bases ................................................................................ 182 each 4. Remove and Salvage Lighting Units.................................................................. 182 each 5. Conduit Bored HDPE 2-Inch .........................................................................31,730 lin. ft. 6. Conduit Bored HDPE 3-Inch .............................................................................. 315 lin. ft. 7. Electrical Wire Lighting 12 AWG...................................................................23,166 lin. ft. 8. Electrical Wire Lighting 6 AWG...................................................................119,857 lin. ft. 9. Pull Boxes Steel 24X36-Inch ............................................................................... 45 each 10. Concrete Lighting Bases .................................................................................... 198 each 11. Concrete Control Cabinet Base ............................................................................. 2 each 12. Electrical Service Meter Breaker Pedestal............................................................. 2 lump sum 13. Lighting Control Cabinets 120/240 30-Inch............................................................ 2 each 14. Reinstall Salvaged Light Pole Type A................................................................ 161 each 15. Install City Furnished Light Pole Type A.............................................................. 37 each 16. Install City Furnished Light Arm Type A............................................................... 37 each 17. Install City Furnished Luminaire Type A ............................................................ 198 each All questions about the meaning or intent of the contract documents are to be directed to the City Engineer. Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by addenda mailed or delivered to all parties recorded by the Engineer as having received proposal forms. Questions received less than ten (10) days prior to the date for opening of bids may not be answered. Only questions answered by formal written addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Addenda may also be issued to modify the contract documents, as deemed advisable by the Board of Public Works or the City Engineer
Award
Roads / Highways
$1,667,254.00
Public - City
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2024
June 10, 2024
Multiple Locations, West Allis, WI
Related To This Project
West Allis, WI
Bid Date: Apr 12 2024
West Allis, WI
--
West Allis, WI
--
West Allis, WI
--
West Allis, WI
--
West Allis, WI
--
West Allis, WI
--
West Allis, WI
Bid Date: Apr 10 2024
West Allis, WI
Bid Date: Mar 13 2024
West Allis, WI
Bid Date: Mar 13 2024
West Allis, WI
Bid Date: Mar 13 2024
West Allis, WI
Bid Date: Feb 28 2024
West Allis, WI
Bid Date: Feb 28 2024
West Allis, WI
Bid Date: Feb 08 2018
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.