BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a playground / park / athletic field in Reedley, California. Completed plans call for site work for a playground / park / athletic field.

As of April 26, 2024 this project was awarded to Dave Christian Construction, with the awarded amount of $2,442,507.50. Sealed bids will be received by the City Council of the City of Reedley for furnishing all labor, materials, services, and equipment and performing all work necessary for the Reedley Sports Park Phase II Project in the City of Reedley, Fresno County. The work includes, in general, new construction of concrete structures (curb & gutter, sidewalk, concrete trail, retaining curb, cross gutters, concrete channels, and curb ramps), extension of the existing roadway, looping through and connecting back into Dinuba, two parking lots graded and paved, new 8-inch water main, expansion of the existing storm drain system, landscaping for the parking lots, roadway, and sports field, natural grass surfacing for the sports field, lighting for the parking lots, roadway, and sport field, utility adjustments, and lastly pavement delineation. The City of Reedley hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religious creed, sex, or national origin in consideration for an award. The prevailing wage rates as determined by the Director of Industrial Relations of the State of California shall apply to this project. In accordance with the provisions of Section 1770 of the Labor Code, the Director of the Department of Industrial Relations of the State of California has determined the general prevailing rates of wages and employer payments for health and welfare, pension, vacation, travel time, and subsistence pay as provided for Section 1773.8 of the California Labor Code, apprenticeship or other training programs authorized by Section 3093 of said code, and similar purposes applicable to the work to be done. Said wages are on file with the City of Reedley and County of Fresno and are incorporated herein as part of the special provisions. By submission of a bid, bidder stipulates and agrees to abide by the provisions of the Labor Code related to payment of prevailing wage or promptly pay a penalty of $50.00 per day per worker paid less than prevailing wage pursuant to the provisions of Labor Code Section 1775. A work day shall not exceed eight hours labor per day or forty (40) hours labor per week. The successful bidder shall keep an accurate record of employees' hours worked by calendar day and week. All questions about the meaning or intent of the Contract Documents shall be directed to the office of the City Engineer in writing. Interpretations or clarifications considered necessary by the City Engineer in response to such questions will be resolved by the issuance of addenda delivered to all parties listed on the plan holders list. Questions received less than 3 business days prior to the date of opening bids shall be considered nonresponsive and therefore not addressed. Only questions that have been resolved by formal written addenda shall be binding. Oral and other interpretations or clarifications will be without legal or contractual effect. The City reserves the right to reject any or all bids, to waive any informality in bids received, or to award the contract to the lowest responsible bidder complying with these instructions as may serve the best interest of the City of Reedley. The City reserves the right to award the contract to other than the lowest bidder if it appears that the best interests of the City of Reedley will be served thereby.

Award

Playgrounds / Parks / Athletic Fields

$2,442,508.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
19
Bidding Soon
334
All Active Projects
142
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

July 1, 2024

img_map_placeholder

20349 E Dinuba Ave, Reedley, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.