EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2024 at 8:00 PM

Updated October 1, 2024

Site work, paving and new construction of a mixed-use development in Clarinda, Iowa. Completed plans call for the construction of a transportation facility; for site work for a transportation facility; and for paving for a transportation facility.

Project consists of 51' x 126' building designed to hold five aircraft. Each of the 5 units will include a 41'-8" x 12'-0" clear opening bi-fold door with hydraulic operator and integrated walk doors. A 12'x12' overhead door will be located on the northwest corner and northeast corner of the building to allow for City of Clarinda airport storage. The building construction will include a concrete floor. Lighting and electrical will be included in the construction of this building. Paving of the new taxilanes and aprons as well as salvaging the pavement in adequate condition are included in this project. Project No - 1231352 Site Directions: Project is located at the Clarinda-Schenck Field Airport, 694 E. La Perla Drive, Clarinda, IA 51632. Est. Completion Date: Dec. 21, 2025 Est. Value: $ 816,390.00 Each proposal shall be accompanied by a bid guaranty in the form of a bid bond, cashier's or certified check, or a credit union certified share draft in a separate sealed envelope in an amount equal to five (5) percent of the total amount of the proposal. If a bid bond is submitted, it must be on the form provided with the Contract Documents. The certified or cashier's check shall be drawn on a bank in Iowa or a bank chartered under the laws of the United States of America; the certified share draft shall be drawn on a credit union in Iowa or a credit union chartered under the laws of the United States; and such check or draft shall be made payable to the City of Clarinda as security that if awarded a contract, the Bidder will enter into a contract at the prices bid and furnish the required performance and payment bond and certificate of insurance. The certified or cashier's check or certified share draft may be cashed, or the bid bond forfeited, and the proceeds retained as liquidated damages if the Bidder fails to execute a contract or file an acceptable performance and payment bond or provide a certificate of insurance within fifteen (15) days after the acceptance of his/her proposal by resolution of the City of Clarinda. No bidder may withdraw a proposal until July 15, 2024. The successful Bidder will be required to furnish a Performance Bond, Payment Bond and Maintenance Bond on separate approved forms in an amount equal to one hundred percent (100%) of the contract price, said bonds to be issued by a responsible surety approved by the City of Clarinda and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all materials and labor and protect and save harmless the City of Clarinda from claims and damages of any kind caused by the operation of the Contractor, and shall also guarantee the work against faulty workmanship or materials for a period of one year after the completion and acceptance of the work by resolution of the City of Clarinda. All work shall be substantially completed within the stated timeframe. The earliest date for a Notice-to-Proceed is anticipated about September 2, 2024 (subject to FAA discretion) or Spring Late Start Date of April 15, 2025. Liquidated damages in the amount of $600.00 per calendar day will be assessed for each day that the work shall remain uncompleted after the end of each base bid phase of the contract period, with due allowance for extensions of the contract period due to conditions beyond control of the Contractor. The Owner reserves the right to select or reject alternate bid items which best serves the Owner's interest. The right is reserved, as the City of Clarinda may require, to reject any and all bids and to waive any informality in the bids received.

Award

Transportation Terminals

$783,118.00

Public - City

New Construction, Paving, Site Work

19

14

2

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Panel Doors
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
38
Bidding Soon
481
All Active Projects
226
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

September 2, 2024

img_map_placeholder

694 E Laperla Dr, Clarinda, IA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

T-Hangar Construction and Taxiway Extension

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.