EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 2, 2024 at 8:00 PM

Updated October 1, 2024

Demolition, site work and addition to an educational facility in Jersey City, New Jersey. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

Bids will be received at the above-referenced location for a lump sum, single prime, Overall General Construction Contract as follows: PROJECT: UACHS STEAM SUITE EXPANSION LOCATED AT: 275-285 West Side Avenue Jersey City, NJ 07305 Bids must be submitted, on forms supplied, in a sealed envelope bearing the name and address of the bidder and addressed to the University Academy Charter High School, Attention: Ms. Rhonda Curry, School Business Administrator/ Board Secretary, 275 West Side Avenue, Jersey City, NJ 07305 with the caption "Sealed Bid" clearly indicating bid title, due date and time. Proposals submitted on forms other than herewith provided will be rejected. Bids shall be received, either in person, at the hour designated in this notice, at University Academy Charter High School, 275-285 West Side Avenue, Jersey City, NJ 07305 by delivery or by mail to the Attention of Ms. Rhonda Curry, School Business Administrator/Board Secretary. If bids are mailed or delivered in person ahead of the time for receipt to the designated location, they are to be inserted in a smaller bid envelope, sealed, and the small envelope is to be inserted into a larger envelope for mailing or delivery clearly marked "Sealed Bid". The University Academy Charter High School will not assume responsibility for bids not delivered in person. Please take note that some overnight delivery services offer a service which guarantees delivery of your packages by 9:00 A.M. The University Academy Charter High School may not be open at this early hour and some vendors are discovering that the delivery services will not re-attempt delivery of the package until after the bid opening. Please be guided accordingly. It is the bidder's responsibility to ensure that bids are presented to the University Academy Charter High School on the hour and at the place designated. NO BIDS SHALL BE RECEIVED, IN PERSON OR BY MAIL, AFTER THE HOUR DESIGNATED FOR RECEIPT. A Bidder's failure to attend the Pre-Bid Conference is at its own risk. A Bidder on public works for a Board of Education where the cost of the work exceeds $20,000 shall be prequalified as required by The State of New Jersey, Department of the Treasury, Division of Property Management and Construction (DPMC) in pursuant to J.J.S.A. 18A:18A-27 through 33, et. Seq. And shall submit with his bid a copy of a valid and active NOTICE OF CLASSIFICATION and a certified copy of a Total Amount of Uncompleted Contracts Form. Each bid, the total price of which exceeds $100,000 shall be accompanied by a Bid Bond, cashier's check or certified check made payable to the Owner for ten percent (10%) of the amount of the total bid, including alternates, not in excess of $20,000. Pursuant to N.J.S.A. 52:25-24.2, Bidders are required by law to submit a list of the names and addresses of all individuals with a 10% ownership interest in the Bidder. All questions, comments, and inquiries should be directed in writing to Ms. Beth Emig no later than April 16, 2024 via email bemig@kssarchitects.com. Written replies to any such questions will be provided to all potential bidders. No oral responses regarding technical questions or interpretations of the specifications will be provided. The University Academy Charter High School reserves the right to reject any non-responsive bid or all, and to waive non-material informalities, in accordance with applicable law, and to take such alternate(s) in sequential order as budget and appropriated funds may allow.

Post-Bid

Educational

$1,000,000.00

Public - City

Addition, Demolition, Site Work

43

23

25

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Cast Decks and Underlayment, Cast Underlayment, Hydraulic Cement Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Wood Treatment, Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Millwork, Architectural Woodwork, Wood Frames
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Membrane Roofing, Roof and Wall Specialties and Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Flush Wood Doors, Entrances and Storefronts, Aluminum-Framed Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Base and Accessories, Resilient Tile Flooring, Carpeting, Wall Finishes, Special Wall Surfacing, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment, Laboratory Fume Hoods
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Window Shades, Roller Window Shades, Casework, Specialty Casework, Laboratory Casework, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Furniture
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Ducts, HVAC Fans, Centrifugal HVAC Fans, Air Outlets and Inlets, Ventilation Hoods, Fume Hoods, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Instrumentation and Control for Electrical Systems, Network Lighting Controls, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Low-Voltage Circuit Protective Devices, Low-Voltage Controllers, Enclosed Controllers, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
583
Active Projects
324
Bidding Soon
5,133
All Active Projects
2,463
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2024

May 9, 2024

img_map_placeholder

275 West Side Ave, Jersey City, NJ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

UACHS Steam Suite Expansion

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.