Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Clarkston, Georgia. Completed plans call for the renovation of a educational facility.
To provide General Contractor services for the construction (Site, Bldg. and Systems) of the Owner's Construction Project at Clarkston High School as specified per the Proposal Documents. Scope will consist of the following: - Security Vestibule - Elevator Addition - Restroom Addition in ADA Classroom - Athletic Storage Building - Stage Lift DeKalb County Board of Education announces that General Contractor Services for Clarkston High School Capital Improvement Classroom Addition are required. PROJECT AND NUMBER: General Contractor Services Clarkston High School Capital Improvement Classroom Addition- ++RFP No. 24-752-022++SERVICES TO BE PROVIDED: General Contractor Services. Furthermore, all Notices concerning this solicitation and award shall be posted to the aforementioned web site. These Notices shall include but are not limited to short list meeting dates and times, presentation meeting dates and times, intended decision and decision information Question Deadline 04/17/2024 at 2:00 PM ET The scope of work for this project consists of the following: • Security Vestibule. • Elevator Addition. • Restroom Addition in ADA Classroom. • Athletic Storage Building. • Stage Lift. The scope of work will include, but is not limited to the following: 1. The Bidder will perform new construction in accordance with the contract drawings and specifications. 2. The Bidder shall be responsible for paying all sales tax in accordance with GA Law section 48-8-63(c) on all material purchases. 3. If the property is being utilized by the DeKalb County School District (DCSD) during construction, the Bidder shall be responsible for coordinating with the DCSD Project Manager and all material and equipment suppliers to schedule delivery of equipment and material to the school/facility during normal business hours. Once the Bidder takes possession of material at the site, the care and storage of the material becomes the responsibility of the Bidder. 4. The Bidder shall obtain all necessary permits required for construction of all work in this scope. The Bidder shall complete all phases of his work in strict accordance with all applicable local, state, and federal codes and guidelines. The Bidder will verify that the necessary DeKalb Board of Education approvals have been obtained prior to beginning of construction. 5. The Bidder is responsible for surveying the existing conditions at the site, to assess installation requirements. The Bidder is responsible for installing equipment in a workmanlike manner, in compliance with DCSD standards as well as all applicable codes and regulations. 6. Care shall be taken to minimize damage to surrounding structures and surfaces. The Bidder is responsible for the repair of any disturbed areas, including ceiling tiles, patching and/or and repainting walls and floors, and restoring any disturbed landscaped or paved areas. The Bidder shall submit color samples to the Owner for any new materials and/or paint used for these corrections, to ensure the best match possible for existing finishes. It is the responsibility of the Bidder to restore any areas damaged by their work to the original condition, or better. 7. The Bidder is responsible for the proper demolition, removal and disposal of existing material disturbed in the installation of the new equipment. The Bidder is to dispose of all debris and removed materials offsite, with the exception of any salvageable material: any salvageable material shall be offered to the Owner for possible reuse. All construction waste is to be recycled to the extent practicable. 8. The Bidder is to keep the work area clean during the completion of the project, and must provide final cleaning of the work area to the satisfaction of DCSD. 9. The Bidder is responsible for coordinating work and ensuring that Project Manager, Stakeholders, and project parties are informed of where and when work is taking place. 10. The Bidder shall restore all construction areas to a condition acceptable to the Owner. 11. The Bidder shall include warranty for his labor. 12. Construction site must be fully closed off from existing school and construction traffic managed as to not disrupt operations or cause any unsafe situations while school is in session. Generally. The Owner shall furnish to the Contractor, prior to the execution of this Contract, any and all written and tangible material in its possession concerning conditions below ground at the site of the Project. Such written and tangible material is furnished to the Contractor only in order to make complete disclosure of such material as being in the possession of the Owner and for no other purpose. By furnishing such material, the Owner does not represent, warrant, or guarantee its accuracy either in whole, in part, implicitly or explicitly, or at all, and shall have no liability, therefore. The Owner shall also furnish, if appropriate, the legal description of the Project site, and any required survey. Available by request: 100% Construction Documents prepared by Goodwin Mills and Cawood, LLC dated 03/21/2024. tijauna_naylor_smith@dekalbschoolsga.or
Post-Bid
Educational
$1,000,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
10
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 23, 2024
August 22, 2024
618 N Indian Creek Dr, Clarkston, GA
Related To This Project
Clarkston, GA
Bid Date: Jun 14 2024
Clarkston, GA
Bid Date: Nov 10 2020
Clarkston, GA
Bid Date: Jul 30 2020
Clarkston, GA
Bid Date: May 29 2019
Clarkston, GA
Bid Date: Jul 09 2024
Clarkston, GA
Bid Date: Aug 16 2024
Clarkston, GA
Bid Date: Aug 29 2024
Clarkston, GA
Bid Date: Sep 20 2024
Clarkston, GA
--
Clarkston, GA
Bid Date: Apr 10 2024
Clarkston, GA
Bid Date: Jan 09 2024
Clarkston, GA
Bid Date: Dec 14 2023
Clarkston, GA
Bid Date: Jul 16 2021
Clarkston, GA
Bid Date: Jan 02 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.