BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Fortuna, California. Completed plans call for site work for a water / sewer project.

Project Information. 2.1 Location and Description. The Project is located on P Street (Between Garden lane and 9th St.) in Fortuna CA 95540, and is described as follows: The localized removal and replacement of approximately 235 feet of existing sewer main and 5 service laterals 2.2 Time for Completion. The Project must be completed within 21 calendar days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about June 1, but the anticipated start date is provided solely for convenience and is neither certain nor binding. Front End Documentation. Please see attachment item B for the stamped engineered plan set. 3. License and Registration Requirements. 3.1 License. This Project requires a valid California contractor's license for the following classifi cation(s): Class A General Contractors license. DIR Registration. City may not accept a Bid Proposal from or enter into the Contract with a bidder, without proof that the bidder is registered with the California Department of Industrial Relations ("DIR") to perform public work pursuant to Labor Code 1725.5, subject to limited legal exceptions. Question Deadline 04/12/2024 Bid Security. The Bid Proposal must be accompanied by bid security of ten percent (10%) of the maximum bid amount, in the form of a cashier's or certifi ed check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that within ten days after City issues the Notice of Potential Award, the successful bidder will execute the Contract and submit the payment and performance bonds, insurance certifi cates and endorsements, and any other submittals required by the Contract Documents and as specifi ed in the Notice of Potential Award. Retention Percentage. The percentage of retention that will be withheld from progress payments is 5%.

Award

Water / Sewer

$115,000.00

Public - City

Site Work

9

6

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
26
All Active Projects
9
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.