Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 26, 2024 at 8:00 PM

Updated May 25, 2024

Renovation of an educational facility in Olivia, Minnesota. Completed plans call for the renovation of a educational facility.

Bids shall be submitted on bid form provided by the Bid Documents. The completed bid form shall be submitted without alterations, additions or erasures. Envelopes containing bid must be sealed & marked "BOLD Summer 2024 Building Improvements" with the name and address of the bidder, the date and hour of the opening and work scope. All debris resulting from the removal and demolition operations shall be disposed of, off-site, subject to any specific regulations imposed by laws, ordinances, orders, or decrees. F. Removal of Existing Pavements and Curbing: 1. Where a portion of an existing pavement, curb, walk, or similar structure is to be retained for use, that portion shall not be damaged during removal operations. 2. In removing pavements, curbs, and similar structures, where the cut will be exposed in the finished work, the structure shall, unless the removal is made to an existing joint and unless determining otherwise by the Engineer, be sawed along the removal lines with a concrete saw to a depth of not less than 1/3 the thickness of the concrete or asphalt before breaking off the concrete or asphalt. In such cases, the use of wedges, driven into the saw cut to break off the portion to be removed, will not be permitted. Elsewhere, the structure shall be cut and chipped to true lines and vertical faces. 3. All demo materials shall be removed from site unless noted otherwise. 4. Where removal of pavement will result in a finished edge or will be abut new pavement, sawcut the existing pavement edge immediately prior to paving, or at a time when damage to the sawcut edge will be minimized. 5. Pavement removals shall include underlying aggregate base and related materials. G. Removal of Existing Underground Watermain and Related Piping and Materials: 1. Remove and dispose of, off-site, all underground utility structures and associated piping. Existing utility structures and piping, designated for removal, shall be removed entirely and shall not be reused. Where structures remain but existing piping is removed, remaining holes in the structures shall be filled with brick and mortar to seal the opening shut. H. Removal of fencing systems, playground equipment, benches, and similar: 1. Removal shall include complete removal of system materials and components, including posts, footings, and other features. Unless noted otherwise, materials scheduled for removal shall not be reused. Bid Results: GENERAL CONSTRUCTION : Robert W. Carlstrom - $ 199,100.00 HVAC AND PLUMBING : Weidner Plumbing & Heating -$ 469,500.00 ELECTRICAL :Laketown Electric - $ 690,000.00 SITEWORK : Schmidt Construction - $ 737,300.00

Bid Results

Educational

$2,095,900.00

Public - City

Renovation

64

26

11

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
26
Bidding Soon
470
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

June 3, 2024

Project location map

701 9th St S, Olivia, MN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed