BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Olivia, Minnesota. Completed plans call for the renovation of a educational facility.

Bids shall be submitted on bid form provided by the Bid Documents. The completed bid form shall be submitted without alterations, additions or erasures. Envelopes containing bid must be sealed & marked "BOLD Summer 2024 Building Improvements" with the name and address of the bidder, the date and hour of the opening and work scope. All debris resulting from the removal and demolition operations shall be disposed of, off-site, subject to any specific regulations imposed by laws, ordinances, orders, or decrees. F. Removal of Existing Pavements and Curbing: 1. Where a portion of an existing pavement, curb, walk, or similar structure is to be retained for use, that portion shall not be damaged during removal operations. 2. In removing pavements, curbs, and similar structures, where the cut will be exposed in the finished work, the structure shall, unless the removal is made to an existing joint and unless determining otherwise by the Engineer, be sawed along the removal lines with a concrete saw to a depth of not less than 1/3 the thickness of the concrete or asphalt before breaking off the concrete or asphalt. In such cases, the use of wedges, driven into the saw cut to break off the portion to be removed, will not be permitted. Elsewhere, the structure shall be cut and chipped to true lines and vertical faces. 3. All demo materials shall be removed from site unless noted otherwise. 4. Where removal of pavement will result in a finished edge or will be abut new pavement, sawcut the existing pavement edge immediately prior to paving, or at a time when damage to the sawcut edge will be minimized. 5. Pavement removals shall include underlying aggregate base and related materials. G. Removal of Existing Underground Watermain and Related Piping and Materials: 1. Remove and dispose of, off-site, all underground utility structures and associated piping. Existing utility structures and piping, designated for removal, shall be removed entirely and shall not be reused. Where structures remain but existing piping is removed, remaining holes in the structures shall be filled with brick and mortar to seal the opening shut. H. Removal of fencing systems, playground equipment, benches, and similar: 1. Removal shall include complete removal of system materials and components, including posts, footings, and other features. Unless noted otherwise, materials scheduled for removal shall not be reused. Bid Results: GENERAL CONSTRUCTION : Robert W. Carlstrom - $ 199,100.00 HVAC AND PLUMBING : Weidner Plumbing & Heating -$ 469,500.00 ELECTRICAL :Laketown Electric - $ 690,000.00 SITEWORK : Schmidt Construction - $ 737,300.00

Bid Results

Educational

$2,095,900.00

Public - City

Renovation

64

26

11

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
22
Bidding Soon
366
All Active Projects
132
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 23, 2024

June 3, 2024

August 23, 2024

img_map_placeholder

701 9th St S, Olivia, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.